34AB-C71-001-2 SCRAM Procedure
Immediate Operator Actions
Perform RC1, 2, and 3
34AB-C51-001-2 Entry into the RPI OR Reactor Ops with Inop OPRMs
Immediate Operator Actions
- IF the reactor is operating in the SCRAM region of the appropriate Attachment 1 OR 2 Power vs. Flow Map, enter 34AB-C71-001-2, Scram Procedure, AND SCRAM the Reactor
- IF the Region of Potential Instabilities (RPI) on the Power vs Flow map in 34GO-OPS-005 is entered, IMMEDIATELY initiate actions to exit the RPI and Immediate Exit Region, to return operation to the Analyzed Region
34AB-B31-001-2 Reactor Recirc Pump Trip, or Recirc Loops Flow Mismatch
Immediate Operator Actions
Loss of both Recirc Pumps;
Enter 34AB-C71-001-2, Scram Procedure, AND SCRAM the reactor.
34AB-E10-001-2 Inadvertent Initiation of ECCS/RCIC
Immediate Operator Actions
- Check validity of ECCS/RCIC initiation signal by observing multiple independent parameters.
a. IF the ECCS initiation signal is not valid and injection is imminent, THEN immediately shutdown affected systems to prevent injection.
(1) IF the affected system is HPCI, depress the HPCI Turbine Trip push button, AND enter 34SO E41 001 2, Attachment 7, HPCI SHUTDOWN FROM INADVERTENT START. (placard)
b. IF ADS timers inadvertently initiated, Inhibit ADS using 2B21-S7A AND 2B21-S7B, ADS Auto Logic Inhibit Switches, on 2H11-P602.
c. IF the RCIC initiation signal is not valid, THEN depress the RCIC Turbine Trip push-button to shutdown the system.
(1) IF RCIC Turbine Trip push button fails to trip RCIC, trip RCIC by closing 2E51-F524, Trip and Throttle Valve.
34AB-N21-001-2 Loss of Feedwater Heating
Immediate Operator Actions
Maintain Reactor power ≥ 1% BELOW the pre-event power level, via recirc flow, using the Master Recirc Flow Control LOWER FAST pushbutton,
OR
as specified on the shift reactivity briefing sheet (exceed 10 Mwe/min)
34AB-R22-002-2 Loss of 4160VAC Emergency Bus
Immediate Operator Actions
Ensure Diesel Generator for affected bus has auto-started.
31RS-OPS-001-2 Control Room Evac
Immediate Operator Actions
Prior to Exiting the Control Room (if possible):
- Enter 34AB-C71-001-2, AND SCRAM the Reactor.
- IF Rx is S/D, Shutdown the Mn Turb and perform TC-1
- Place Lvl Cntrl in SINGLE ELEMENT and perform RC-2
If Evac for Fire Immediately dispatch Operators to the Diesel Generator Building to perform the Diesel Generator actions per fire AB.
SS shall perform the following:
- Announce situation
- Direct Ops and RP to RSDP
- Grab radios and phones, flashlights
- Send someone to TSC for SPDS
- If habitable send to Computer Room for Process Computer