304.1 State the location and function of the buildings which comprise NCTAMS LANT:
a. M51 - Main building
b. M52 - Warehouse
c. M113 - Facilities
d. M125 - Training building
304.2 How many UPS units are there at NCTAMS LANT and where is each located:
- 2 - UPS room 1119
- 2- UPS room 1132
304.3 In the event of a power failure at building M51, who must first be contacted in order to initiate power restoral procedures:
- Call Public Works to see when power will be restored and what the issue is
304.4 What number is called when reporting a fire at NCTAMS LANT:
- Base Emergency: 444-3333
304.5 What are the requirements for checking out a government vehicle from N4:
- Changes frequently. But generally: NCTAMS LANT ID badge, military ID and a valid state driver’s license.
304.6 How many UST’s are there at NCTAMS LANT:
- 3 Underground Storage Tanks. 1 and 2 are 4000gal and 4 is 12000gal.
304.7 What are the locations of the UST’S:
- N4 compound adjacent to Gen Room 3.
304.8 Explain the fuel delivery procedure. Include who, when, and how:
- Note 1: Fuel delivery after normal working hours and during foul weather is prohibited.
- Note 2: Two Personnel are required during fuel delivery. The POIC will be located in Gen. Rm. # 3 at the Manifold and Tank Monitor. The second person will be located outside at the UST. Use Truck Delivery Fuel Transfer checklist.
- Note 3: All personnel involved with Fuel delivery must be NCTAMS LANT EOOW qualified (except delivery driver).
- Note 4: Once started, the fuel delivery will not be stopped until transfer is complete, except in the event of an emergency.
- Warning: At no time will the fuel stations be left unattended during fuel transfer. If for any reason you must leave, i.e. fire alarm or bomb threat, the fuel transfer will be secured.
1. Using the “Fuel Transfer Checklist”, attain permission from N4 Department Head prior to starting delivery transfer.
2. Stick UST #3 and record readings, in both inches and gallons in the EOOW log and Truck Delivery Fuel Transfer checklist.
3. Verify with the delivery driver the amount of fuel to be transferred.
4. At the half way mark of your calculated delivery, stick UST #3 and record readings in the EOOW log.
5. Once delivery is complete stick UST #3 and record readings in the EOOW log and Truck Delivery Fuel Transfer Checklist.
6. Secure from fuel transfer and place the Fuel Manifold for Gen. Rm. #3 in normal configuration IAW SOP D-10.
7. Inform Dept. Head of completion.
304.9 State the locations of the NCTAMS LANT A/C Chiller Units:
- Chiller 1 - room 1110
- Chiller 2 - room 1110
- Chiller 3 - alleyway
304.10 State where all AST’s are located:
- Generator room 1
- Generator room 2
- Generator room 3
- Behind Warehouse
- Chiller generator
304.11 State the size of all AST’s:
- Generator room 1 - 150 gal
- Generator room 2 - 150 gal
- Generator room 3 - 150 gal
- Warehouse Generator - 1000 gal
- Chiller generator - 1000 gal
304.12 Describe the manual Diesel Start-up and Shutdown procedures. (Bi-Weekly, Monthly, and Quarterly)
- WEEKLY: Exercise the engine.
- MONTHLY: Exercise the ATS (automatic transfer switch), Soft transfer of power.
- QUARTERLY: Simulated power loss, Hard transfer of power.