15A - Control the Project Scope Flashcards

1
Q

Project products or results that are completed and verified for their correctness while performing quality control.

A

verified deliverables

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

An official examination of work results to verify that requirements are met; it involves measuring, examining, and verifying results to be sure work and deliverables meet requirements and acceptance criteria. It may also be referred to as reviews, product reviews, or walkthroughs.

A

inspection (review) (product review) (audit) (walkthrough)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The quantifiable deviance or amount of departure from the expected results for any component of product and service being developed, including quality, schedule, and cost.

A

variance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The analysis of variance from the original scope baseline or the quantification of departure from expected results.

A

variance analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly