For construction projects the fire department may be allowed to require what before construction begins
Installation of mains and hydrants
Construction elevator
Temporary, manual elevator constructed on outside of building fro construction purposes. Removed once building is done. Fd may have to use it
Material hoist
Intended only to move construction material. Not to be used for personnel, not same safety features
With construction projects, a lighted stairwell is required for buildings over
4 stories or 50 ft
Fire prevention usually requires what during and after torch use
Fire watch
Temporary fire protection must be installed on some large scale or long term projects. They include what systems
Standpipes
Sprinklers
Fire exit Type for existing occupants in a side not undergoing expansion to allow them through the expansion portion
Fire rated tunnels
Danger of unprotected buildings in demolition
Possibility of extension to other buildings still in use
With demolition, structural members are being removed, during fire a primary concern is
Structural collapse
Construction sites are difficult to gain access to because
Fenced or barricaded for public saftey