Z17 Control Building Vent Flashcards

1
Q

What are computer room fan trips?

A

Fire >135°F
Freeze < 35°F
Halon pre-discharge signal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How is the logic reset for the exhaust fan after a halon signal on the computer room vent system?

A

Handswitch must be taken to stop

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the trips for Access Control Air exhaust fan?

A

Freeze protection
smoke detected
MPD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the purge fan trips?

A

No suction path
HVAC not in start and fire protection auto start clears
MPD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What will autostart control building purge?

A

Auto start of fire protection in HVAC equipment rooms if switch is in auto and flow path is established

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the trips for control building HVAC fan coil units?

A

Freeze protection <35°F
Fire protection > 135°F
C02 system actuated
MPD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What else trips when the exhaust fan trips on the hot machine shop vent system?

A

Fan coil unit fans and circulating fans

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is most effected on over temperature in Control Building vent System?

A

RPS MG set rooms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What’s the start sequence for control building purge?

A

F003 auto opens, purge fan starts on F003 full open, stops when fire detection clears

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When does the Hot Machine Shop exhaust filter train run during normal operation?

A

Continuous

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What kind of pressure is the Hot machine shop maintained?

A

Negative

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When will the standby fan coil unit start for the hot machine shop?

A

83°F if HS is in auto

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What’s the purpose of Control Building Ventilation?

A

Provide controlled environment for access control area, upper and lower cable spreading rooms, computer rooms, HVAC room, and elevator machine room

Also, removes smoke and fumes from the areas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What cools the control building ventilation?

A

PCW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Power supply for all Control Building ventilation?

A

11B21

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What autostarts the control building purge fan?

A

Flow path available and fire protection in the HVAC equipment room

17
Q

Z17 What trips the purge fan?

A

No suction pain
HVAC fire detection signal cleared and HS not in start
MPD