E38 Feedwater Leakage Control Flashcards

1
Q

E38 What are the time critical actions?

A

Has to be initiated within 18 minutes of Hi Rad indication lF feed water to the vessel cannot be restored.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the interlocks of the F001B

A

< 33 psig downstream of F001B before opening

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the interlocks of the E38-F001A? outboard

A

FW isolation Valve B21-F065A/B must be full closed

<33psig downstream of FOOTA F001A

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where are the inboard and outboard FWLC isolation valves located?

A

Steam tunnel 139’ aux building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What provides flow to the outboard FWLC subsystem?

A

RHR A jokey pump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What valve does the outboard system seal between?

A

F065A/B and F032A/B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What’s the purpose of FWLC?

A

Minimizes release of fission products following a LOCA by providing positive water seal on FW piping between CTMT isolation check valves and outboard isolation valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What provides flow to the inboard system?

A

RHR B jockey pump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What valves does the inboard system seal between?

A

F032A/B and F010A/B

How well did you know this?
1
Not at all
2
3
4
5
Perfectly