E38 What are the time critical actions?
Has to be initiated within 18 minutes of Hi Rad indication lF feed water to the vessel cannot be restored.
What are the interlocks of the F001B
< 33 psig downstream of F001B before opening
What are the interlocks of the E38-F001A? outboard
FW isolation Valve B21-F065A/B must be full closed
<33psig downstream of FOOTA F001A
Where are the inboard and outboard FWLC isolation valves located?
Steam tunnel 139’ aux building
What provides flow to the outboard FWLC subsystem?
RHR A jokey pump
What valve does the outboard system seal between?
F065A/B and F032A/B
What’s the purpose of FWLC?
Minimizes release of fission products following a LOCA by providing positive water seal on FW piping between CTMT isolation check valves and outboard isolation valves
What provides flow to the inboard system?
RHR B jockey pump
What valves does the inboard system seal between?
F032A/B and F010A/B