E31 MSIV Leakage Flashcards

1
Q

E32 Can Div 1 and Div 2 be used at the same time?

A

No

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the time critical actions?

A

Cannot be used until 20 min after a LOCA

Can be used within 18 mins from receiving hi DW rad consistent with DBA LOCA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Describe sequence for starting outboard MSIV.

A

Have LOCA
< 20 psig (34.7psia)
HS taken to initiate
F008 / F009 open to depressurize because >28.9 psia
@28.9 psia enter long term cleanup F006/F007 open and F008 / F009 close
If 28.9 psia is reached F006/F007 go closed and you have to re initiate.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

E32 What are the 2 modes of operation?

A

Main steam line depressurization

Long-term cooling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

E32 What is the primary side?

A

Outboard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

E32 What is the secondary side?

A

Inboard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

E32 outboard power supplies

A

16B41

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

E32 inboard power supply

A

15B21

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

E32 Outboard initiation permissives

A

20 psig rx pressure

20 psig MSL pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

E32 inboard initiation permissive

A

20 psig rx pressure
20 psig MSL pressure
>90% inboard MSIV closure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What must be running to use MSIV leakage system?

A

Standby gas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How is MSIV leakage system initiated?

A

Manually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly