E31 MSIV Leakage Flashcards
E32 Can Div 1 and Div 2 be used at the same time?
No
What are the time critical actions?
Cannot be used until 20 min after a LOCA
Can be used within 18 mins from receiving hi DW rad consistent with DBA LOCA
Describe sequence for starting outboard MSIV.
Have LOCA
< 20 psig (34.7psia)
HS taken to initiate
F008 / F009 open to depressurize because >28.9 psia
@28.9 psia enter long term cleanup F006/F007 open and F008 / F009 close
If 28.9 psia is reached F006/F007 go closed and you have to re initiate.
E32 What are the 2 modes of operation?
Main steam line depressurization
Long-term cooling
E32 What is the primary side?
Outboard
E32 What is the secondary side?
Inboard
E32 outboard power supplies
16B41
E32 inboard power supply
15B21
E32 Outboard initiation permissives
20 psig rx pressure
20 psig MSL pressure
E32 inboard initiation permissive
20 psig rx pressure
20 psig MSL pressure
>90% inboard MSIV closure
What must be running to use MSIV leakage system?
Standby gas
How is MSIV leakage system initiated?
Manually