Week 3 - Train On Fire, Hot Axle Box Flashcards
What must a signaller do when receiving a report of a fire on a train? (M1 Reg 4)
Stop the train immediately
When receiving a report of a train on fire, where possible you must not stop the train or allow it to remain where? (M1 Reg 4)
- In a tunnel
- On a viaduct
- Any other unsuitable place
What must you do when receiving a report of a hot axle box? (TW5 Reg 15.3)
- Stop the train immediately
- Stop all trains on the adjacent line(s)
- Advise control
After stopping a train due to a report of a hot axle box, what must you tell the driver? (TW5 Reg 15.3)
- Which axle box is affected by identifying the axle number
- On which side of the train the affected axle box is
- To examine the vehicle concerned
After stopping a train due to a report of a hot axle box, what must you tell the driver if you don’t know which axle box is affected? (TW5 Reg 15.3)
- Give the driver as much information as possible
- Tell the driver the approximate location of the defective vehicle
- Tell the driver to examine the whole train if necessary
What must we do with adjacent lines around a train stopped with a hot axle box? (TW5 Reg 15.3)
- Ask the driver if the adjacent line(s) are obstructed
- If reported clear we can allow any other train which has been stopped to proceed
How soon must a driver carry out an examination after stopping due to a report of a hot axle box?
What is the speed restriction if this is not accomplished? (TW5 Reg 15.3)
- 10 minutes
- 20mph (30km/h)
What do we do if, after a report of a hot axle box, the examination reveals no evidence of overheating? (TW5 Reg 15)
- Inform Control
- Authorise the train to proceed normally
- Advise the driver of any instructions received from control
What do we do if, after a report of a hot axle box, the examination reveals evidence of overheating? (TW5 Reg 15)
- Inform Control
- Only authorise the train to proceed when operations control give authority for the train to move
- Advise the driver of any instructions received from control
- Stop all trains on adjacent lines before you give the authority for the movement
- Advise any other signallers concerned
- Signal the train to the next location where it can be dealt with
What are the speed limits for a train when, after a report of a hot axle box, the examination reveals evidence of overheating? (TW5 Reg 15.6)
- 10mph (15km/h)
- 5mph (10km/h) over any points and crossings