Strip Shopping Center Flashcards
Initial Fire Flow Estimate (Commercial)
20gpm per 100 sqft
(Average store 25 x 50) = 250gpm
Plenum Space
Space between structural ceiling and drop ceiling used as pathway for hvac return airflow
At what temperature will steel fail
1000º it will twist and expand
FDC Connection (Strip Shopping)
2nd Due Engine
Identify and supply all existing FDCs
Bar that secures the door to the frame (strip shopping)
Maverick Bars
Signs of Collapse and Hazard distance Strip Shopping
Bulges, Cracks and seeping smoke.
Maintain distance of at least 1.5 times wall height
2nd due engine driver (strip shopping)
Establishing a water supply and stretch a supply hose to FDC
Charge when a company reports smoke or fire
Supply all connections except for test
3rd Due Engine (strip Shopping)
Supply Side C FDC and provide rooftop hose line
Roof Cuts at strip shopping center
Start with small 2x2 ft
Clear roofing material in 5 x 5ft area for a 4x4 ventilation opening
Ladder MUSTS on strip shopping
2 or more to the roof for means of egress
Second Stories due to limited egress for rescues and escape routes