Purpose of the Steam Dump system
A
- After reactor trip this system reduces Tavg to 547F (no-load value) without actuation of the S/G safeties
- Following load rejection, reduces Tavg to within 5F of Tref, then the Rod Control System will take over to reduce Tavg to 1F of Tref in rods are in auto
- When placing the plant in cold shutdown, used to cool down the plant until it can be placed on RHR.
2
Q
Valves are divided into? Each provide how much steam capacity?
A
- Bank 1 provide a total of 24% (At a 10% Load rejection)
- Bank 2 provide a total of 16% (At a 10% load rejection)
- Bank 4 provide a total of 17% (50% load rejection)
3
Q
Bank 4 is special because?
A
- Bank 4 is comprised of the S/G PORVs
- Only controlled by steam dump controller with a 50% load rejection.
- The steam dump controller will activate the S/G PORVs only if the turbine is not tripped
4
Q
PORVS are what kind of valve?
A
- AOVs,
- Normal supply of control gas is from IA
- Backup supply from the Steam dump Nitrogen System
5
Q
Steam Dump Spray line valves off of the condensate system open when?
A
-Open when we use the steam dump system.