Aux Building HVAC Flashcards
1
Q
Control Room Ventilation
HVA-1A/B
Location? Power supplies? Keeps CR between? Cooled by and backup?
A
- Behind door 42
- 1A from MCC-16
- 1B from MCC-18
- 70-77F
- SW normal cooling, Fire Water is backup
2
Q
2 trains for CR Ventilation
Consist of?
A
- A powered from MCC-16 which supplies HVA-1A, HVE-19A, and WCCU-1A
- B powered from MCC-18 which supplies HVA-1B, HVE-19B, and WCCU-1B
3
Q
CR Ventilation also has a ACU (Air Cleaning Unit)
A
-Contains Prefilter, Charcoal absorber, Post HEPA filter
4
Q
EDG room ventilation normal supplied by?
Exhausted by?
A
- HVS-1 (Aux building Supply Fan)
- HVE-2A/2B
5
Q
EDG room ventilation when EDG is running?
A
- HVS-5 (B) and HVS-6 (A) supplies
- HVE-17 (B) and HVE-18 (A) exhaust
6
Q
Power Supplies for EDG HVAC?
A
- HVS-6 (A) - MCC-6
- HVS-5 (B) - MCC-5
- HVE-17 (B) -MCC-6
- HVE-18 (A) -MCC-5
- HVS-1 - MCC-5
- HVE-2A/2B - MCC-5/6
7
Q
S/A/R SI/RHR/AFW what are associated HVACs? Power supplies? Locations?
A
- HVH-6A/B (SI room) MCC-5/6
- HVH-7A/B (AFW room) MCC-6/5 (Backwards power)
- HVH-8A/B (RHR) MCC-5/6 (A is in B RHR pit)
8
Q
HVH-6A/B start when?
A
- 6A starts when CV spray Pump A starts, SI pump A starts, or Si pump B (When powered from E-1)
- 6B starts when CV spray pump B starts, SI Pump B starts or Si Pump B(When powered from E-2)
9
Q
HVH-7A/B start when?
A
- A starts when MDAFW Pump B starts
- B starts when MDAFW Pump A starts
10
Q
HVH-8A/B start when?
A
- A starts with A RHR pump, even though its in Pit B
- B starts with B RHR pump even though its in Pit A