Standard Operating Procedures - PRO-NOR-SOP-08 Engine Start Flashcards
69- In most case scenario What to do if an Automatic Engine Start procedure is Abort by the FADEC?
PRO-NOR-SOP-08 P1
- Nothing…
- When the Cycle is Completed use:
* The Manual Start Procedure.
70- What to do IF during the Engine Start, the Ground Crew reports a Fuel Leak from the Engine Drain Mast?
PRO-NOR-SOP-08 P1
- The Crew shall Run the Engine at Idle for 5 Min
* If the Leak Disappears during these 5 Min, the Aircraft
can be Dispatched Without Maintenance Action
* If the Leak is Still Present after 5 Min, Maintenance
Action may be required Before the Flight.
71- Why is ENG 2 Usually Start First?
PRO-NOR-SOP-08 P1
Engine 2 powers the Yellow Hydraulic System that pressurizes the Parking Brake.
72- What to do in case of Electrical Supply Interruption during the Start Sequence (Loss of ECAM DUs)
PRO-NOR-SOP-08 P1
Abort the Start…
- Switch OFF the ENG MASTER Switches
- Perform a 30 s Dry Crank on the Starting ENG
IE: Loss of APU During First ENG Start.
73- What are the FADEC Actions when it Detects an impending Hung Start or Hot Start?
PRO-NOR-SOP-08 P2
- The FADEC applies an Automatic Recovery Sequence
Without an ECAM message
- Dual Ignition (A+B) is applied, Fuel is Commanded OFF
and then Re-Commanded ON within 0.5 sec
- It is Not Necessary for the Crew to Shut Down the
Engine.
74- When a PTU FAULT will be triggered?
PRO-NOR-SOP-08 P2
If the Second Engine is started within 40s following the End
of the Cargo Doors Operation.