What is the minimum diameter head for nails used to install ashphalt singles?
9.5 MM or quarter inch
According to the regulations for construction projects, At what height should you provide guide rails for scaffolds?
8’ and over
When installing roofing materials what is install 1st?
Drip edge
What is done to protect the eaves from ice damming?
Double layer of 15 pounds filled paper cemented at the lapse
What exposure and nailing is typical for 3 tab asphalt shingles?
5 and 3/4 of an inch, 4 nails
How many area does one “square” of shingles cover?
100 ft²
What is the minimum clearance between the ground level and stucco siding?
200 MM
Key words: Stucco, clearance over Ground level
(1) Stucco shall be not less than 200mm above finished ground level except when it is applied over concrete or masonry.
Beveled siding butts into trim corner Pieces, How are these Corner pieces fastened?
Nailed through the sheathing into studs
How are hip and ridge caps applied when using wood shingles?
Alternately overlap
Where is step flashing Used?
The intersection of sloped roofs and vertical walls, placed under each shingle.
What is the minimum penetration of roofing nails into the roof sheeting?
12MM
What is the maximum distance between support That a Scaffold plank can span?
7’
What is the minimum roof slope that aspalt shingles can be applied in a normal application?
1 in 3
Table 9.26.3.1.
Roofing types and Slope Limits
Before a cant strip, No fewer than ____ plies of membrane shall be carried over top
2
Key Word: Cant strips
- 26.11.10 Cant strips
(2) No fewer than two plies of the roofing membrane shall be carried over the top of the cant strip.
What is the minimum door width and height required for an entrance into a dwelling unit?
OBC
810MM X 1980MM
(31.89” x 77.953”)
Table 9.5.11.1. (1)
According to the regulations for construction project, In Ontario what is the ladder slope ratio.
1 in 4 to 1 and 3
Roof having a slope of 1 in 3 has a ceiling area of 900 ft². How many square feet of venting would be required?
Three.
What are the 4 types of Chimney flashing?
Step flashing, Counter flashing, Front Apron and saddle
When installing a cylindrical lock, What does the term “ Back-set” refer to?
The distance between the lock edge of the door and the centerline of the cross bore.
What is the name of the cornice that projects from the edge of the building as it travels up the slope of the Gable end?
Rake cornice
What is the minimum airspace required between brick veneer and wood framing?
25 MM
When installing board and batten siding, Batten should be install by:
Overlapping boards 3/4 inch on either side with one row of nails driven into the joint between the boards
What is the minimum amount that the hip and ridge caps Should extend on either side of the hip or ridge when installing an asphalt shingle roof?
OBC
100 M M
9.26.7.6. Hips and Ridges
What is the minimum distance that starter strip should project past the drip edge?
OBC
12MM
Key words: starter Strips, Asphalt shingles
9.26.7.2.
What is the name of the build-up section behind the chimney?
Cricket
How high must a chimney flue extend above the highest roof surface within 3M of a chimney?
OBC
600 MM
Key words: Chimney flues, height
9.21.4.4. Height of Chimney Flues
According to the code, Where should the footing drainage tile be located?
The top of the pipe is below the bottom of the floor slab
Key Words: Drainage tile
- 14.3.3. Installation
(1) Drain tile pipe shall be laid on undisturbed or well-compacted soil so that the top of the tile or pipe is below the bottom of the floor slab or the ground cover of the crawl space.
What is used to prevent forced entry through an exterior door?
Solid blocking shall be provided at lock height on both sides
What is the minimum lap for beveled wood siding?
OBC
25mm
Keyword : Siding, Cladding, lumber siding.
- 27.6. Lumber Siding
- 27.6.3. Joints
(2) 25mm for lapped bevel siding
How many bundles of asphalt shingle does it take to cover approximately one square?
Three