Block D Framing Flashcards
How many nails and length of nail are required to attach a 38mm x 140 mm plank decking?
2 nails 82mm in length
O.B.C 9.23.3.4. table
Procedure for installing a window
Level bottom, plumb sides, check square, shim sides
Determine the headroom for a stairwell when given the stairwell opening, framing and the unit rise/unit run. Stairwell opening: 3290mm Framing material: 315mm Unit rise: 185mm Unit run: 255mm
2072mm
Stairwell = Urun/Urise ( Headroom + Framing material)
3290 = 255/185 ( Headroom + 315)
3290 = 1.3784 ( Headroom + 315)
3290/ 1.3784 = Headroom + 315
(3290/ 1.3784) - 315 = Headroom
Headroom = 2071.825 mm or 2072mm
How many nails and what is the length of nail required to attach a roof truss to a top plate
3 nails, toenailed 82mm in length
OBC 9.23.3.4. table
When ventilating an attic space, how much ventilation is required at the soffit?
Not less than 25% Keywords: 9.19. Roof Spaces OBC 9.19.1.2. Vent Requirements OBC 9.19.1.2.(3)(c)
New attic hatch is installed, what is the minimum square footage size allowed
0.32 m²
9.19. Roof Spaces
OBC 9.19.2.1.(3)
What is size vent is required needed if the roof slope is 1in 8 and the roof space is 300 sqm?
2 m²
9.19. Roof Spaces
OBC 9.19.1.2.(2) 1 in 8 is less than 1 in 6 therefore the venting ration is 1/150, 300sqm would require 2 sqm of venting
Number of squash blocks needed for a rectangular building 24’-10” x 18’-9” with one load bearing beam and joists 16 “ o.c.
108
24.83333’ x .75=18.625 therefore 17 ‘I’joists and 2 rim joists. Each ‘I’ joist requires 2 squash blocks (one on each side) at three different location (side, middle beam, side) totaling 6pcs.
17 x 6=102. Each rim joist needs only three (one at each location). 2 x 3 = 6 +102=108 squash blocks
A building is 24 x 40 ft with a vaulted ceiling with a 2/3 slope . How many bundles of insulation are needed to insulate ceiling if a bag covers 82.3 sq ft and 2 layers of insulation are required
28 Bags
First convert the slope to get a the measurements required:
2/3 = 8/12 of slope.
Find the ULL, c = ULL 8² + 12² = c² 64 + 144 = c² c = √ 208 ULL = c = 14.422
Find Run,
Buildings width ÷ 2 = run
Run = 24 ÷ 2
Run = 12
Find the Rafter length = RL,
RL = run x ULL
RL = 12’ x 14.4222
Rafter Length = 173.0665’ or 14’ 5”
Bag of insulation needed = Bundles or Bags = ?
(Rafter Length x Building’s Length x Sides x Layers ) divided by per
ft.² covered on each bag.
Bags = (14.422 x 40’ x 2 sides x 2 layers) ÷ 82.3 ft.²
Bags = 28.0379 or 28
What size is the rough opening to be framed for a double door when given the following dimensions. 30” door 1/8” door gap allowance 5/8” jamb material 1” shimming gap
63 ⅝”
30” x 2 = 60”, double doors
(1/8” x3), 3/8”, 3 gaps = 2 sides 1 middle
(5/8” x 2) = 1 1/4” , jambs for both sides
= 1” x 2 = 2”, gaps for both sides
= 60” + ⅜” + 1 ¼” + 2”
= 63 ⅝”
How is a Skylight to be framed into a roof?
Install outer header to inner trimmer rafters, install cripple rafters to outer header, install inner header to outer header and inner trimmer rafter, install common rafter to inner trimmer rafter
What is done when a flush beam hanger does not reach the top of the web?
Web stiffener on either side
A roof has a span of 24 feet and is unequal slope, minor 8/12, major 4/12. Both top plates are the same height, what is the total rise?
64”
Given:
Building’s span = 24’
Greater slope = 8/12
Lesser slope = 4/12
Find the Run for both slopes:
For 4/12 slope,
unit rise x span = 4 x 24 = 96” or 8’
Run for 4/12 slope = 8’
For 8/12 slope,
unit rise x span = 8 x 24 = 192” or 16’
Run for 8/12 slope = 16’
Finally, we calculate for the Total Rise. To get an accurate result we need to cross multiple each sides’ run and unit rise.
Steeper slope’s unit rise x gradual slope’s run.
8 x 8 = 64”
Steeper slope’s run x gradual slope’s unit rise.
16 x 4 = 64”
64
What is the minimum staggered space for a double top plate?
Not less than one stud space
How many rows of bridging needed on a floor system that has a clear span of 4.5m?
2
- Wood Frame Construction
- 23.9. Floor Joists
Code 9.23.9.4.(1)(b)Code says 2.1m from each supports so 4.5m/2.1m= 2.14 or 3 spaces therefore 2 rows are needed.
What is required in regards to safety when installing a cricket on a roof?
Lifeline & Harness
How do you support a rake cornice that is overhanging 2 feet?
Cantilevered lookouts
What is the purpose of H clips on a roof?
to prevent deflection of the sheets between trusses
What is the minimum width of a 4-ply built up beam pocket?
7”
6” + 1/2” on either side minimum spacing
4 x 1 ½” = 6”
2 x ½” = 1”
Total width 7”
What is done to keep trusses for falling during installation?
attach a diagonal brace across the top chord of the trusses
What is done to prevent squeak in joist/hanger/beam connection
apply mastic to hanger before installation of joist.
Minimum collar tie material is
2x4 (38 x 89)
The layout from one wall studs from the end to the 3rd stud in at 24” O.C would be?
47 ¼”
The shortening amount for the tail cut of a hip rafter measured how?
At a right angle to the plumb cut and is the full diagonal thickness of the rough fascia.
A shed Roofs rafter run is determined by?
the span – one wall thickness