- 0POP01-ZO-0006 Risk Management Actions*
- *
What does the risk assessment calculator assess?
Incremental Conditional Core Damage Probability
Weekly Trip Risk Probability
Used in MODES 1 and 2
- 0PGP03-ZE-0004 Plant Surveillance Program*
- *
What surveillances does the plant surveillance program procedure govern?
Tech Specs
TRM
ODCM
- 0POP01-ZO-0006 Risk Management Actions*
- *
What does front stop completion time and the back stop completion time mean?
- Front Stop Completion Time:*
- *LCO action times in conventional Tech Specs**
- Back Stop Completion Time:*
- *Ultimate LCO Action Times permitted by Risk Management Tech Specs (RMTS)**
- Takes precedence over any Risk-Informed Completion Time calculated to be greater than 30 days*
Note:
Risk-Management Technical Specifications (RMTS): Plant-specific set of configuration-based Technical Specifications, based on a formally approved configuration risk management program and associated probabilistic risk assessment, designed to supplement previous conventional plant Technical Specifications.
- 0PGP04-ZE-0313 Maintenance Rule Program*
- *
What does it mean when a piece of equipment is classified as (a)(1) or (a)(2)?
- (a)(1):*
- *Monitored by goals**
Requires increased attention to improve performance
- (a)(2):*
- *Monitored by performance criteria**
Performing adequately
- 0POP01-ZO-0006 Risk Management Actions*
- *
Who approves risk management actions?
Plant General Manager
Shift Manager in charge of implementing actions.
- 0PGP03-ZE-0004 Plant Surveillance Program*
- *
What must be done if a SR is interrupted and that interruption extends past shift change?
Suspend the SR
- 0PGP03-ZE-0004 Plant Surveillance Program*
- *
Who must the test coordinator inform once the SR is completed, suspended, or has failed?
Shift Manager
Test coordinator will forward results to the surveillance scheduler.