- 0PGP03-ZA-0114 Fatigue Rule*
- *
What are the work hour limits?
16 hrs in 24 hrs
26 hrs in 48 hrs
72 hrs in 7 days
- *10 hr break between days**
- 8 hr break allowed for crew transition*
34 hr break in any 9 day calendar days
These are rolling time periods
Note:
If a covered worker exceeds 54 hrs in 1 week, then a CR must be generated
- 0PGP03-ZA-0112 Fatigue Rule Waivers*
- *
When is a fatigue rule waiver authorized to be used?
Mitigates or prevents condition adverse to nuclear safety
- SM determines if waiver necessary
- Plant General Manager approves waiver
- 0POP01-ZA-0014 License Operator Maintenance*
- *
What must be done in order to activate a license?
- *Stand 60 hrs of plant familiarization**
- Only required for initial activation*
Stand 40 hrs of U/I
Do a plant tour
- *Discussion with Plant Manager**
- Command and Control*
Note:
If license was activated in the current quarter, then do not have to perform license maintenance for that quarter to stay active.
- 0POP01-ZA-0014 License Operator Maintenance*
- *
What is required to maintain an active license each quarter?
Seven (7) 8 hr shifts
Five (5) 12 hr shifts
Physicals are valid
- *Enrolled in License Operator Requal Training**
- License Operator Upgrade Training does NOT count*
- 0PGP03-ZO-0042 Reactivity Management*
- *
What are the significant levels of Reactivity Management?
- Level 1: (Highest)*
- *Significant Event**
- Fundamental Organizational Breakdown*
- Level 2:*
- *Consequential Event**
- Violation of Design Basis / License*
- Level 3:*
- *Unacceptable Event**
- Violation of Process / Procedures*
- Level 4:*
- *Precursor**
- Level 5: (Lowest)*
- *Concern**
- Level 6:*
- *No Impact**
- 0PGP03-ZO-0042 Reactivity Management*
- *
What is the Plant manager, Operations Manager, Unit Operations Manager, and SM responsible for?
- Plant Manager:*
- *Ensures reactivity management philosophy**
- Operations Manager:*
- *Implements reactivity management program**
- Unit Operations Manager:*
- *Determines event classification**
- Shift Manager:*
- *Daily application**
- 0PGP03-ZO-0042 Reactivity Management*
- *
A planned reactivity change must be reviewed by a SRO or Rx Engineering if the reactivity change exceeds what amount?
± 100 pcm boron
± 2% RTP
Must also be approved by operations management
- 0POP01-ZO-0004 Extreme Cold Weather Guidelines*
- *
When is cold weather guidelines implemented?
≤ 40 ˚F for 24 hrs
≤ 34 ˚F
Also done if weather is expected to achieve these temperatures.
Note:
Extreme cold weather season is 10/31 - 3/31.
- 0POP01-ZO-0004 Extreme Cold Weather Guidelines*
- *
Who is responsible for implementing the extreme cold weather program?
Shift Manger
- 0PGP03-ZA-0114 Fatigue Rule*
- *
What is the minimum amount of time per week that operations personnel must have off?
- Normally: (12 hr shifts)*
- *2.5 days/week**
- Outage:*
- *3 days / 15 day period**
Outage fatigue rules can only apply for 60 days.