  • 0PGP03-ZA-0114 Fatigue Rule*
    • *

What are the work hour limits?

A

16 hrs in 24 hrs

26 hrs in 48 hrs

72 hrs in 7 days

  • *10 hr break between days**
  • 8 hr break allowed for crew transition*

34 hr break in any 9 day calendar days

These are rolling time periods

Note:
If a covered worker exceeds 54 hrs in 1 week, then a CR must be generated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 0PGP03-ZA-0112 Fatigue Rule Waivers*
    • *

When is a fatigue rule waiver authorized to be used?

A

Mitigates or prevents condition adverse to nuclear safety

  • SM determines if waiver necessary
  • Plant General Manager approves waiver
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 0POP01-ZA-0014 License Operator Maintenance*
    • *

What must be done in order to activate a license?

A
  • *Stand 60 hrs of plant familiarization**
  • Only required for initial activation*

Stand 40 hrs of U/I

Do a plant tour

  • *Discussion with Plant Manager**
  • Command and Control*

Note:
If license was activated in the current quarter, then do not have to perform license maintenance for that quarter to stay active.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 0POP01-ZA-0014 License Operator Maintenance*
    • *

What is required to maintain an active license each quarter?

A

Seven (7) 8 hr shifts

Five (5) 12 hr shifts

Physicals are valid

  • *Enrolled in License Operator Requal Training**
  • License Operator Upgrade Training does NOT count*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 0PGP03-ZO-0042 Reactivity Management*
    • *

What are the significant levels of Reactivity Management?

A
  • Level 1: (Highest)*
  • *Significant Event**
  • Fundamental Organizational Breakdown*
  • Level 2:*
  • *Consequential Event**
  • Violation of Design Basis / License*
  • Level 3:*
  • *Unacceptable Event**
  • Violation of Process / Procedures*
  • Level 4:*
  • *Precursor**
  • Level 5: (Lowest)*
  • *Concern**
  • Level 6:*
  • *No Impact**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 0PGP03-ZO-0042 Reactivity Management*
    • *

What is the Plant manager, Operations Manager, Unit Operations Manager, and SM responsible for?

A
  • Plant Manager:*
  • *Ensures reactivity management philosophy**
  • Operations Manager:*
  • *Implements reactivity management program**
  • Unit Operations Manager:*
  • *Determines event classification**
  • Shift Manager:*
  • *Daily application**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 0PGP03-ZO-0042 Reactivity Management*
    • *

A planned reactivity change must be reviewed by a SRO or Rx Engineering if the reactivity change exceeds what amount?

A

± 100 pcm boron

± 2% RTP

Must also be approved by operations management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 0POP01-ZO-0004 Extreme Cold Weather Guidelines*
    • *

When is cold weather guidelines implemented?

A

≤ 40 ˚F for 24 hrs

≤ 34 ˚F

Also done if weather is expected to achieve these temperatures.

Note:
Extreme cold weather season is 10/31 - 3/31.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 0POP01-ZO-0004 Extreme Cold Weather Guidelines*
    • *

Who is responsible for implementing the extreme cold weather program?

A

Shift Manger

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 0PGP03-ZA-0114 Fatigue Rule*
    • *

What is the minimum amount of time per week that operations personnel must have off?

A
  • Normally: (12 hr shifts)*
  • *2.5 days/week**
  • Outage:*
  • *3 days / 15 day period**

Outage fatigue rules can only apply for 60 days.