Set 12 Flashcards

1
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

What dose would classify a task as having significant radiation exposure?

A

≥ 10 mrem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 0PGP03-ZO-EC02 Lockout / Tagout Program*
    • *

What requires double valve isolation?

A
  • *Fluid systems > 150 psig or > 200 ˚F**
  • Hazardous System*

SFP Discharge Piping

Systems containing radioactive fluids

Systems containing chemically hazardous fluids

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 0PGP03-ZO-EC02 Lockout / Tagout Program*
    • *

What is the proper sequence for removing a motor driven pump from service?

A

Electrically isolate motor

Close pump discharge

Close pump recirc.

Close pump suction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

If during an emergency, the Issuing Authority wishes to release an ECO, and both the Acceptor and his immediate supervisor can not be notified. Who can release the ECO?

A
  • *Issuing Authority**
  • Written notification must be attached to each acceptor’s security badge.*

Security will stop each acceptor next time they enter site to tell them what happened.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

Who can be a technical reviewer?

A

SRO w/ NRC License

SRO w/ Certification for STP

Qualified Individual designated by OPS management

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

What is a severity Level 1, Level 2, and Level 3 event?

A
  • Level 1:*
  • *Discovered after work has started**
  • Level 2:*
  • *Discovered after ECO released**
  • Level 3:*
  • *Discovered before ECO released**

To classify for these events, the error discovered potentially or could potentially expose a worker to hazardous energy.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

If a backseated MOV must change positions in order to perform its intended safety function, the Unit Supervisor is required to do what?

A

Declare MOV inoperable until operation verified

Make appropriate log entries

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 0PGP03-ZO-EC02 Lockout / Tagout Program*
    • *

Is the use of human danger tags authorized?

A

No

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

Who can waive the IV on an ECO restoration?

A
  • *Issuing Authority**
  • Unit Operations Division Manager (Designee) must concur*

IV waived for significant radiation exposure, personnel safety reduction, or for emergency conditions.

Note:
IV on locked components cannot be waived

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 0PGP03-ZO-EC02 Lockout / Tagout Program*
    • *

Whose permission is required to use a check valve, relief valve, or a fail open valve as a tagout boundary?

A

Unit Operations Manager

Maintenance Division Manager / General Maintenance Supervisor

Also need their approval if:

  • Working on system > 140 ˚F without a system vent/drain.
  • Using a freeze seal
  • Working on flange adjacent to boundary valve
  • Any backseated valve used for single valve isolation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

What kind of verification is used for installing / removing grounding devices?

A

Dual Verification

Cannot be waived.

Note:
Opening disconnects and removing/installing fuses also require dual verification.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • 0PGP03-ZO-EC01 Equipment Clearance Orders*
    • *

Who has authority to resolve clearance book interface jurisdictional conflicts?

A

Unit 1 Shift Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly