- 0PGP03-ZO-0003 Temporary Modifications*
- *
When is a modification not considered a temporary configuration change?
Not required to be operable
Will not result in a change to drawing/design
Does not require an engineering change
- 0POP01-ZO-0002 345 kV Switchyard*
- *
What is a hold tag?
- *Used to designate the correct state for circuit isolation**
- Do not operate with authorization from CNP transmission RTO*
- 0PGP03-ZO-0039 Configuration Management*
- *
Who coordinates the computer point off scan review?
Engineering Duty Manager
- 0PGP03-ZO-0039 Configuration Management*
- *
If the Plant Computer User Defined Alarm is used to monitor and trend a parameter, is tracking the parameter still required?
No
- 0PSP03-XC-0002 Initial Containment Inspection*
- *
What is the max occupancy of containment during normal operations?
- *72 people**
- PAL and AAL must be OPERABLE*
Normal Operations is MODE 1 - 4 (Doors normally closed) or MODE 5 with the doors closed
- 0POP01-ZO-0002 345 kV Switchyard*
- *
Who has operational jurisdiction over all the 345 kV equipment?
Centerpoint Energy
Note:
The plant owns the MSU Xfmr disconnects and standby XFMR disconnects.
- 0POP01-ZO-0002 345 kV Switchyard*
- *
Who can be designated as a STP designated qualified operators?
Unit Supervisor
SM
Unit Operations Manager
- 0PGP03-ZO-0003 Temporary Modifications*
- *
How often must the SM check the Temporary Modifications Log to ensure that no Temporary Modifications need to be removed?
Prior to a MODE change
- 0PSP03-XC-0002A Containment Entry (Integrity Established)*
- *
Who can perform all sections of this surveillance with exception of closing out the surveillance?
Non-Licensed work control SRO
- 0PSP03-XC-0002A Containment Entry (Integrity Established)*
- *
Who determines what tools, test equipment, or other material may be left inside the RCB once personnel exit containment with integrity established?
SM / Unit Supervisor
- 0PSP03-XC-0002A Containment Entry (Integrity Established)*
- *
If a Øa occurs while personnel are in containment, where should personnel evacuate?
Aux Air Lock
If Aux Air Lock unavailable, must reset Øa and open the PAL OCIV. Personnel can then exit via the PAL.
- 0PGP03-ZO-0039 Configuration Management*
- *
How often is the operator aid review performed?
Quarterly
Performed by issuing authority.
Note:
The continuing need for each Operator Aid does not need to be verified. (kinda strange)
- 0PGP03-ZO-0003 Temporary Modifications*
- *
Is the removal of pipe caps, plugs, or blind flanges downstream of isolation valves subject to the temporary modifications procedure?
No
- 0POP01-ZO-0002 345 kV Switchyard*
- *
If a switching order affects Unit 1 and Unit 2, who coordinates the switching order?
Unit 1
Note:
Switching Order: Order given by CNP transmission RTO to open/close breakers owned by the transmission service provider
- 0PGP03-ZO-0003 Temporary Modifications*
- *
Who is responsible for reviewing a temporary modification PRIOR to the approving of work?
SRO