Set 6 Flashcards

1
Q
  • 0PGP03-ZO-0003 Temporary Modifications*
    • *

When is a modification not considered a temporary configuration change?

A

Not required to be operable

Will not result in a change to drawing/design

Does not require an engineering change

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • 0POP01-ZO-0002 345 kV Switchyard*
    • *

What is a hold tag?

A
  • *Used to designate the correct state for circuit isolation**
  • Do not operate with authorization from CNP transmission RTO*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • 0PGP03-ZO-0039 Configuration Management*
    • *

Who coordinates the computer point off scan review?

A

Engineering Duty Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • 0PGP03-ZO-0039 Configuration Management*
    • *

If the Plant Computer User Defined Alarm is used to monitor and trend a parameter, is tracking the parameter still required?

A

No

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • 0PSP03-XC-0002 Initial Containment Inspection*
    • *

What is the max occupancy of containment during normal operations?

A
  • *72 people**
  • PAL and AAL must be OPERABLE*

Normal Operations is MODE 1 - 4 (Doors normally closed) or MODE 5 with the doors closed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • 0POP01-ZO-0002 345 kV Switchyard*
    • *

Who has operational jurisdiction over all the 345 kV equipment?

A

Centerpoint Energy

Note:
The plant owns the MSU Xfmr disconnects and standby XFMR disconnects.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • 0POP01-ZO-0002 345 kV Switchyard*
    • *

Who can be designated as a STP designated qualified operators?

A

Unit Supervisor

SM

Unit Operations Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • 0PGP03-ZO-0003 Temporary Modifications*
    • *

How often must the SM check the Temporary Modifications Log to ensure that no Temporary Modifications need to be removed?

A

Prior to a MODE change

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • 0PSP03-XC-0002A Containment Entry (Integrity Established)*
    • *

Who can perform all sections of this surveillance with exception of closing out the surveillance?

A

Non-Licensed work control SRO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • 0PSP03-XC-0002A Containment Entry (Integrity Established)*
    • *

Who determines what tools, test equipment, or other material may be left inside the RCB once personnel exit containment with integrity established?

A

SM / Unit Supervisor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • 0PSP03-XC-0002A Containment Entry (Integrity Established)*
    • *

If a Øa occurs while personnel are in containment, where should personnel evacuate?

A

Aux Air Lock

If Aux Air Lock unavailable, must reset Øa and open the PAL OCIV. Personnel can then exit via the PAL.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • 0PGP03-ZO-0039 Configuration Management*
    • *

How often is the operator aid review performed?

A

Quarterly

Performed by issuing authority.

Note:
The continuing need for each Operator Aid does not need to be verified. (kinda strange)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • 0PGP03-ZO-0003 Temporary Modifications*
    • *

Is the removal of pipe caps, plugs, or blind flanges downstream of isolation valves subject to the temporary modifications procedure?

A

No

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • 0POP01-ZO-0002 345 kV Switchyard*
    • *

If a switching order affects Unit 1 and Unit 2, who coordinates the switching order?

A

Unit 1

Note:
Switching Order: Order given by CNP transmission RTO to open/close breakers owned by the transmission service provider

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • 0PGP03-ZO-0003 Temporary Modifications*
    • *

Who is responsible for reviewing a temporary modification PRIOR to the approving of work?

A

SRO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  • 0PGP03-ZO-0039 Configuration Management*
    • *

If a computer point was taken off scan, removed from alarm checking, or a substitute value entered, the computer point must be tracked in the points off scan log. When must the review be performed?

A

36 hrs

If another point is available, then review can be extended to 72 hrs.

17
Q
  • 0PSP03-XC-0002 Initial Containment Inspection*
    • *

Who can perform the initial containment inspection to establish integrity?

A

SRO

18
Q
  • 0PGP03-ZO-0039 Configuration Management*
    • *

If the information is contained in another document, drawing, OR an approved procedure, can an operator aid be used?

A

No

19
Q
  • 0PGP03-ZO-0003 Temporary Modifications*
    • *

What kind of temporary leak repairs are covered under 0POP03-ZO-0003 Temporary Modifications?

A
  • Requires:*
  • *P&ID Change**
  • Valve kill / packing injection excluded*

Procedure Change

CROE

Training

Note:
Normal temporary leak repairs are covered under 0PGP03-ZO-0009 Temporary Leak Repair

20
Q
  • 0PSP03-XC-0002 Initial Containment Inspection*
    • *

What is the purpose of 0PSP03-XC-0002 Initial Containment Inspection to Establish Integrity?

A
  • *Visual Inspection to ensure no loose debris present**
  • Could clog emergency sump strainers during LOCA*

Verify 48” containment purge valves closed

Verify 18” Supplementary purge valves open/closed