RNAV and RNP Ops Flashcards

1
Q

What needs to be confirmed in the flight planning phase for RNAV1 & RNAV2 operations?

A

1) Necessary nav aids (including critical DME’s) are serviceable for the planned route.2) When critical DME’s are uncervicable confirm DME GAP within 14nm, if not RNAV1,2 operations are prohibited.3) The letter ‘R’ is placed in block 10 of the flight plan and D1 placed in block 18 after PBN in case of RNAV1 operations & C1 in case of RNAV2 operations.OM 4-S-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What needs to be confirmed in the SID specific requirements for RNAV1/2?

A

RWY, SID & transition route-Waypoint sequence-Reasonableness of track angles & distances-Altitude & speed restriction-Direction of turn at waypoint which is fly by or fly over.4-S-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What needs to be confirmed before take-off on an RNAV1/2 SID?

A

-Check all required on board equipment is available(FDIG- FMC, DME, IRS, GPS)-Check the position is updated by GPS on PROG pg 2/2 (If PF ask PM to check)4-S-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If GPS is not available what must be confirmed before take off for RNAV1/2 SID?

A

-Confirm airplane position is updated at the RWY threshold. (Update performed by pushing N1)-In case of intersection take-off, enter the shift distance to the intersection point (not needed when intersection point is within 1000ft FM threshold.4-S-14

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

After Take-Off phase (SID & En-route specific requirements)?

A

RNAV 1 routes- Autopilot or FD in LNAVRNAV 2 routes- Autopilot or FD in LNAV however ND may be used.If critical DME (DME GAP more than 14nm) has become unserviceable during the flight the crew should notify ATC and request vectors.4-S-14

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Before Approach phase (STAR specific requirements) RNAV1/2?

A

RNAV1- A/P or FD in LNAV/NAV modeRNAV2- A/P or FD in LNAV/NAV mode however ND may be used.Check the STAR & RWY are set in system, check;-Waypoint sequence-Reasonableness of track angles & distances-Altitude & speed restriction-Direction of turn at waypoint which is fly by or fly over.If critical DME (gap more than 14nm) becomes unserviceable notify ATC immediately and request radar vectors.4-S-14

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the required on-board equipment for RNAV1/2?

A

FDIG!FMCDMEIRSGPS (Only required when flying the route where GPS is required)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Flight planning phase for RNAV5?

A

‘R’ is placed in block 10 of the flight plan & ‘B1’ is placed in block 18 after PBN4-S-13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Before departure phase RNAV5?

A

NAME?

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

After take-off phase RNAV5?

A

Fly in AP or FD in LNAV mode however ND may be used.4-S-17

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Required on-board equipment RNAV5 operations?

A

FDIGV!FMSVORDMEIRSGPS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Flight planning stage RNAV10 (RNP10) operations?

A

Captain & Flight dispatcher shall confirm;-A/C approval for RNAV10 (RNP10) operations, allowable flight time & route eligibility.-‘R’ placed in block 10 of ATS flight plan and ‘A1’ placed in block 18 after PBN.4-S-19

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Before entering RNAV10 (RNP10) airspace?

A

-Confirm on board equipment for operations is operative. (If equip fail notify ATC & follow instructions).-When position updating is required due to allowable flight time limit, confirm that navigation equipment shall be updated by appropriate nav aids within its coverage.4-S-19

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Required on board equipment RNAV10 (RNP10)?

A

-FMSx1, IRSx2 GPSx1- Unlimited -FMSx1, IRSx2- 9hours 33 minutes-FMSx2, IRSx2 GPSx1- Unlimited-FMSx2, IRSx2- 9hours 33 minutes** L,R of MCDU & L,R of IRS shall be operative4-S-21

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Renewal of allowable flight time by automatic updating?

A

DME/DME- Allowable flight time- 18minVOR/DME- Allowable flight time- 30min4-S-20

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Flight planning phase RNP4?

A

1.) Letter R in block 10 & L1 in block 18.2.) Verify on NOTAM whether the minimum number of 24 satellites for RNP 4 is available.4-S-29

17
Q

Before Departure phase RNP4?

A

1.) Verify validity of NAV database.2.) Review contingency procedures for RNP4 airspace.4-S-29

18
Q

Before commencing RNP4 operations?

A

Verify the on board equipment is operative.

19
Q

During flight in RNP4

A

-Verify RNP loaded in system matches the published value. If different enter correct value.-In principle use A/P or F/D in LNAV.-Monitor X track error-X Track error should be limited to +/-1/2xRNP, brief deviations immediately after turns up to a max of 1xRNP are allowable.4-S-29

20
Q

Required equipment RNP4?

A

FMSx2IRSx2GPSx2EHSIx22 MCDU/CDU shall be operativeIf one GPS becomes Inop change to RNAV 10 ops4-S-30