Rail Adhesion Flashcards
1
Q
When must you arrange for a controlled test stop? (3)
A
- Operations control tell you that railhead has been inspected and nothing unusual found.
- Operations control tell you that the railhead has been inspected and improvement treatment carried out.
- At least 30 minutes has passed since you was told about the reportable railhead adhesion.
2
Q
What type of train, if possible, is required to perform a controlled test stop?
A
Similar type that reported the conditions
3
Q
After a reportable rail adhesion, when can normal working be resumed?
A
A controlled test has been carried out and railhead adhesion level is no longer reportable
4
Q
What must you do if you receive a report of serious or prolonged wheel slip from a driver?
A
Arrange for the affected portion of the line to be inspected