Memory Flashcards
What revision is the MOE?
MOE Issue 1 Revision 11
What is APN 206?
A/C utilisation (uplifts) in AMOS
What is the ALD # and Issue for a transit?
Describe;
Part 1
Part 2
Part 3
ALD 430, Issue 29
Part 1 - FCOM/OPS & HYD Level, O2, Engine Oil
Part 2- A/C Inspection
Part 3 - A/C Dispatch
AMP-
Approved Maintenance Programme
MMEL -
Master Minimum Equipment List
MMEL comes from aircraft manufacturer and approved by the national aviation authority.
Form 4 Holders -
Kenneth Mutton - Compliance Monitoring Manager
Pat Tobin - Head of Quality
Paddy Dunne - DOM
Andy Byrne - Hanger Manager
Paddy Dunne - LMM
Lynne?
What is the current revision of the:
AMM
ALD 430
ALD 431
AMP
A320 AMP
What is the current revision of the:
AMM
AMM REV. 108
ALD 430 ISS. 29 – A320 Transit Check
ALD 431 ISS. 40 – A320 Ramp Check
A320 AMP REV.31
What is the MOE?
Maintenance organisation exposition is a document which details the maintenance organisation’s :
structure and management responsibilities, scope of work, description of facilities, maintenance procedures and quality assurance or inspection systems.
EASA REQ.
MOE IS ISSUE 1 REVISION 11
CDL -
CDL - Component Deviation List
What EASA doc reflects the ETOPS maintenance requirements?
EASA AMC 20-6
If a component is missing from the aircraft can the MEL be used to release the aircraft?
No missing components bust be deferred IAW the CDL which is in the Flight Manual.
Authority to extend an MEL rectifcation interval can be given by the
Requests are made by the DMM to the IAA, for B, C & D
What is the ALD # and Issue for a transit?
Describe;
Part 1
Part 2
Part 3
ALD 430, Issue 29
Part 1 - FCOM/OPS & HYD Level, O2, Engine Oil
Part 2- A/C Inspection
Part 3 - A/C Dispatch
Describe the cockpit checks for a ramp A:
For the cockpit checks on a Ramp A you must check:
* Parking brake, set (check chocks first)
* If the A/C has been fueled, if not: Open refuel panel & select mode select switch to refuel for 25 seconds. Return to the normal position before the aircraft is powered down.
* If its supposed to freeze, ensure A/C is ditched. Avo Vents + Ditching closed.
* Check for open Technical Log entries
* Ensure the ramp B has enough time left on it for the next day.
* Sign the CRS for Ramp A
Who approves if we fit a part without a Form 1 at an outstation?
The Quality Manager - Pat Tobin