1
Q
  • LOT 202.22 Circulating Water*
    • *

What will auto start the CW Screen Wash Pumps?

A

Lead Pump:
Screen D/P > 6”
One Screen Running

First Lag Pump:
10 Sec after lead pump start, Pressure < 102 psig
4 Screens Running

Second Lag Pump:
10 Sec after 1st lag pump start, Pressure < 102 psig
7 Screens Running

If pump started on low pressure will not stop. (Must reset)

Note:
Spray valves will open when pressure > 90 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • LOT 202.22 Circulating Water*
    • *

What reservoir temperature will require running all four CW pumps?

A

69 ˚F

Running all four CW Pumps < 69 ˚F will raise the plant’s condensate depression and lower overall efficiency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • LOT 202.22 Circulating Water*
    • *

What will energize the blue start permissive light on CP009?

A

Discharge Column filled*

  • *Seal Pressure > 30 psig**
  • < 50 psig starts standby pump*

Discharge Valve Closed

> 5 mins since last CW pump start

Can use Jet pump to draw air and moisture out of CW discharge column.

  • Uses screen wash header as prime water
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • LOT 202.22 Circulating Water*
    • *

What is the CW pump securing sequence?

A
  • Third and Fourth Pumps:*
  • *Once Discharge MOV 80% Open, Pump Stops**

Discharge MOV fully Closes

  • First and Second Pumps:*
  • *Once 2nd pump’s Discharge MOV 95% Open, BOTH PUMPS TRIP**

Valves Remain As-Is (95% Open / Fully Open)

Must wait 5 mins between securing pumps

Note:
PTL:**Bypasses 5 min TD but Discharge MOVs will still fully close

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • LOT 202.22 Circulating Water*
    • *

What is the CW pump start sequence?

A
  • First Pump:*
  • *10 sec after start, Discharge MOV opens to 40%**
  • Second Pump:*
  • *10 sec after start, 2nd Pump’s Discharge MOV fully opens**

Once 2nd Pump’s Discharge MOV is 35% open, 1st Pump’s Discharge MOV fully opens

  • Third / Fourth Pump:*
  • *10 sec after start, Discharge MOVs fully open**

Pump trips:

  • Discharge MOV NOT moving after 24 sec
  • Discharge MOV NOT 35% open in 32 sec
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • LOT 202.22 Circulating Water*
    • *

What systems utilize the CW discharge piping?

A

OL-ACW

ECW Blowdown

  • *LWPS**
  • Connects to OL-ACW (MAB Chiller 11 in overhead)*
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • LOT 202.22 Circulating Water*
    • *

What will trip a CW pump?

A
  • Starting Pump:*
  • *Discharge MOV NOT moving after 24 sec**

Discharge MOV NOT ≥ 35% open in 32 sec

  • Stopping Last 2 CW Pumps:*
  • *Stopping 1 pump trips both**
  • Discharge valves remain open*