At which organizational level are costs managed in a production order?
Controlling area
During the manufacturing execution process, which steps include a material availability check?
Availability check can be performed manually or automatically at the time of the creation of the production order.It is automatically performed when the order is released.
Which master data is responsasible for the scheduling of the order? ( order created, costs are planned and order scheduled)
Routing Work Center
Production order created, materials are reserved, which master data is responsible for these reservations?
BOM
True or false: A production order can be confirmed before the release of the order.
False: The order must be released before any goods movements or confirmation can occur.
What procurement type would you suggest in the material master for finished goods?
In-house production
What are task lists and what are the different types of task lists in SAP?
Task list = indicate steps used making a item.
Routing
Master recipe
Rate Routing
What are PRT’s and what type of data are they?
Production resources and tools are master data.
What field in work center master record links the work center with a CO object?
The costing tab in the work center master record has filed linking the work center to a cost center in CO.
What represents categories of data stored in the work center master record?
Scheduling
Costing
Capacity
Planning
What combination in the work center master record is used to define activity prices?
The costing tab of the work center master record contains a link to a cost center as well as activity types available at that work center. The combination of cost center/activity type is used to derive the activity price.
Operations in the routing include time elements. What is an example of a fixed time assigned to an operation?
Setup time. (time required to set up the work center to perform the operation. This is a fixed time and does not depend on any quantities produced.
Operations in routing include time elements. What is an example of a variable time assigned to an opleration?
Time per unit = how much time it takes to complete the operation
BOM components not assigned to an operation in a routing default to which operation.
Components default to the first operation
In addition to BOM components, name other master data that can be assigned to an operation.
PRT