What is the key when it comes to high rise operations?
Pre planning
As of 2 years ago, how many high rises are in Tucson?
455
How does the Uniform Fire Code define a high rise?
Any building over 75’ in height
In Tucson, what is considered a high rise?
Any building that is 4 or more stories or 50’
All buildings in the city limits greater than 50’ have…
Sprinklers and standpipes
City comms may refer to high rise as _____ __
Building 3
Where is the highest concentration of high rises in Tucson
UofA
How high is the aerial ladder?
110’
What are some similarities of high rise buildings?
Beyond reach of aerial equipment Height Building setbacks Unopenable windows Potential stack effect Unreasonable evacuation time
What is the “stack effect”?
When the smoke effects the upper floors of the building
High rise buildings are not fireproof. Many have large ____ ____ ____ with a ____ fire load
Open floor areas
High
High rises are usually ____ which can create smouldering fires
Airtight
Window failure can result in exterior fire ___ ____
Lapping over
What are the 8 things we are thinking about when we pre plan a high rise fire?
Access Communications Occupant load Construction Utilities FIre protection equipment Water supply Building engineer/plans
A stairwell on the exterior of a building will be designated as the ____ stairwell
Evacuation
What is a standpipe system?
A wet or dry system of piping, valves, outlets, and related equipment designed to provide water at specified pressures and installed exclusively for the purpose of fighting fires
What are standpipes designed to do?
Provide a quick and convenient means to fight fire in large low buildings or upper stories of higher buildings
Fire department connections must have ____ or ____ caps in place
Removable or breakable
FDCs must be accessible by the FD and cannot be ____
Obstructed
FDCs are regulated by NFPA __
14
On a siamese connection, the letters must be __” in height
1”
5 facts about standpipe markings…
Tell at a glance how many systems Engineers ensure correct system supplied Allows attack team to correctly ID system and floor level Originate on north side, NW corner Continues clockwise around the building
Exterior standpipe markings have to bee what size?
7x7” diamond
What does the letter and number mean on an exterior standpipe marking?
Letter indicates which system
Number indicates how many systems
Interior standpipe markings have to be what size?
5x5” diamond
What does the letter and number mean on an interior standpipe marking?
Letter indicates which system
Number indicates how many floors above or below ground
Roof outlet will not have a number, just a letter
How to tell if you are above or below ground with the standpipe marking?
Above ground the letter will be above the number
Below ground the letter will be below the number
How many 2 1/2 lines must be made to a standpipe?
2
Where do you put the tips from the shutoff butt when making a standpipe?
Place on the ground under the connections
Before connecting the shutoff butt, what 2 things should you look for?
Check for gasket
Check for obstructions
If there is a missing gasket, where can you get one?
From the nozzle tip on the ground
What do you do if there is a damaged or obstructed FDC?
Go to the second floor
Use siamese with double female
Support fittings with rope to support weight
Open valve