H&S Flashcards

1
Q

What are the CDM Regulations 2015

A

The main set of regulations for managing the health, safety and welfare of construction projects

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What were the key changes in 2007 to the CDM Regs

A
  • Replacement of CDM Coordinator with PD
  • Removing the exemption for domestic clients but passing the CDM duties to the contractor
  • Changing the requirement to appoint PD where there is more than one contractor”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the role of the principal designer

A

Plan, manage, monitor and coordinate H&S in the pre contract phase of a project

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is an F10

A

The F10 is a document that is submitted to the HSE to notify them of a scheme when notifiable

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When Is a project notifiable

A

“When it hits one of the below

  • +500 man hours
  • +30 days in duration
  • More than 20 site operatives”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who should ensure the F10 is in place

A

The client

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does a site induction consist of

A

”- Outline of the project

  • First aid arrangements
  • Site specific risks - Site rules”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Do you know what a PCI document is

A

“Pre construction information pack

Contains info the client already possesses about the site

Parts

  • Project details
  • Planning and management of works
  • Arrangements for controlling significant site risks
  • Plan for H&S file”
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What CSCS Card do you have

A

Academically qualified persons card

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How long does your CSCS card last for

A

5 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the HASWA 1974

A

To provide adequate training to staff to ensure H&S procedures are understood and adhered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What do domestic client have to do now. How/ who can they pass it onto

A

Same as client

The responsibilities are normally passed to the contractor or principle contractor

Or it can be passed to the PD with written confirmation”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What would be in a site induction

A

“It covers all risk on site:

Fire exits
Evacuation procedures
PPE requirements
Operating hours
Site specific risks
Site rules"
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What would be in a site induction

A

“It covers all risk on site:

Fire exits
Evacuation procedures
PPE requirements
Operating hours
Site specific risks
Site rules"
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What risks have you come across on site

A
"Site traffic
Slips trips falls
Dust
Fire
Working at height
Crane=over head working
Moving plant"
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What would be part of your desktop risk assessment

A

Identify Hazards
Decide who will be harmed and how
Evaluate risk and take precautions to prevent them
Record the risk assessment
Review and update risk assessment throughout job”

17
Q

What is a hazard

A

Hazard: something that could potentially cause harm.

18
Q

What is a risk

A

Risk: the degree of likelihood that harm will be caused

19
Q

What has the CLC operating guidance been

A

“It provides site operating procedures for operating safely during the pandemic to reduce transmission;

Safe travel
Safe access & Egress
Hand washing
Toilet procedures
Mess area rules
Close working rules
Cleaning rules

It was withdrawn on the 4th April 2022

20
Q

What is a SWMP

A

It is a site waste management plan to ensure as little waste as possible is going to the tip

21
Q

When do you need a SWMP

A

When a scheme is over £300k

22
Q

Does the RICS provide any guidance on health and safety

A

The RICS produces Surveying Safely

23
Q

What is Surveying Safely

A

It sets out good practice and principles for H&S for members & firms

24
Q

When should the client appoint a PD

A

As early as possible during the design process

25
Q

What were the key changes to the CDM regulations in 2015?

A

”- CDM coordinator replaced with principal designer

  • Notifiable projects with the F10 notice
  • Domestic clients are no longer exempt
  • simplified structure “
26
Q

where would you see the F10 notice on site?

A

if a F10 notice is required, this should be clearly identified as the first thing you see when you arrive on site. When signing in

27
Q

what does CSCS mean?

A

Construction Skills Certification Scheme