Gypsum Construction Handbook Flashcards

1
Q
  1. __________fastener should be used when 3/8”, ½” and 5/8” single layer gypsum panels are attached to wood framing.

A. 1-1/2” Type G bugle head
B. 1-1/4 Type S bugle head
C. 1-1/8” Type S bugle head
D. 1-1/4” Type W bugle head

A
  1. D Page 39
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. __________is/are warning signs of fastener imperfections.

A. Darkening
B. Localized cracking
C. Protrusion of the fasteners
D. All of the above

A
  1. D Page 370
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. Extended periods of ________ will discolor panel face paper.
    A. High humidity
    B. Low humidity
    C. Cold weather
    D. Strong sunlight
A
  1. D Page 355
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. ⅜-inch gypsum panels are designed for framing centers up to ________.

A. 24 inches
B. 16 inches
C. 20 inches
D. 12 inches

A
  1. B Page 3
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. _________is often caused by excessively fast drying of joint compounds.

A. Loose panels
B. Board sagging
C. Joint cracking
D. None of the above

A
  1. C Page 370
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. Use ______screw to connect ¾ inch single-layer panels to steel studs.

A. 1 inch Type S bugle head
B. 1⅛ inch Type S bugle head
C. 1¼ inch Type S bugle head
D. 2¼ inch Type S bugle head

A
  1. C Page 38
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. Stack panels face up with ends resting on nominal 2” x 4” lumber and with center of the boards resting on floor, and allow to remain overnight or until they have ________.

A. A 1” space between adjacent panels
B. At least a 2” permanent bow
C. No stains or discoloration on face paper
D. All of the above

A
  1. B Page 112
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. Maintain and control heat in the range of 55°F to 70°F 24 hours ________the entire gypsum board finishing process.

A. Before
B. During
C. After
D. All of the above

A
  1. D Page 103
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. Board sags in ceiling are often caused by ______.

A. Improperly fitted panels
B. Insufficient support of board
C. High-humid conditions
D. All of the above

A
  1. D Page 371
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. Long partition runs shall have _________to compensate for hygrometric and thermal expansion.

A. Relief joints
B. Expansion joints
C. All the above
D. Control joints

A
  1. D Page 358
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. All but ________will cause cracking of compound joints in veneer plaster finishing.

A. Maximum air circulation
B. Rapid drying
C. Possible shrinkage
D. All of the above

A
  1. D Page 355
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. Maximum frame spacing for ⅜ inch single-layer ceiling application is ________o.c.

A. 12 inches
B. 16 inches
C. 24 inches
D. In compliance with local building codes

A
  1. B Page 73
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. Where single-nailing is used, drive nails at least________ inch(es) from ends or edges of gypsum board.

A. ¼ inch
B. ⅝ inch
C. ½ inch
D. ⅜ inch

A
  1. D Page 108
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. Joint defects generally occur in a straight-line pattern and in most cases result from ________.

A. Incorrect framing
B. Incorrect joint treatment
C. Climatic conditions
D. All of the above

A
  1. D Page 370
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. Wood furring strips over wood framing shall be ______minimum size for nail-on application.

A. 1” x 1”
B. 1” x 2”
C. 1” x 3”
D. 2” x 2”

A
  1. D Page 90
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. It is desirable to limit deflection to _______and never exceed L/120 for drywall assemblies.

A. L/120
B. L/180
C. L/240
D. L/360

A
  1. C Page 70
17
Q
  1. According to The Gypsum Construction Handbook, a drywall hammer is used to ________.

A. compress gypsum panel face and leave desired dimple
B. wedge panels
C. pry panels D.
E. All of the above

A
  1. A Page 424
18
Q
  1. The screw must enter perpendicular to the board face for proper performance, drive screws at least __________ from ends or edges of the gypsum board.

A. ¼ inch
B. ⅜ inch
C. ½ inch
D. ⅝ inch

A
  1. B Page 110
19
Q
  1. A board sagging between ceiling support is caused by ________.

A. Improper ventilation
B. Extended exposure to strong sunlight
C. Low humidity
D. High humidity

A
  1. D Page 353
20
Q
  1. A minimum temperature of __________should be maintained during gypsum board application.

A. 45° F
B. 50° F
C. 55° F
D. 70° F

A
  1. B Page 105
21
Q
  1. Gypsum products may not be stored in ________temperatures that exceed F.

A. 115°
B. 125°
C. 130°
D. 135°

A
  1. B Page 3
22
Q
  1. Tape overlapped at joint intersections _______in veneer plaster.

A. Is recommended to strengthen the joints
B. Is only recommended when the joints are at angles
C. Is only recommended if the joints are out of alignment
D. Can cause joint cracking

A
  1. D Page 386
23
Q
  1. __________of panels may be subject to scuffing and may develop paper bond failure or paper delamination from the gypsum core after application.

A. Board sag
B. Too much adhesive
C. Water damage
D. Strong sunlight

A
  1. C Page 372
24
Q
  1. Where gypsum panels are attached to furring channels use _______screw.

A. Type S bugle head
B. Type S-12 trim head
C. Type W bugle head
D. Type G bugle head

A
  1. A Page 124
25
Q
  1. Firecode C Core gypsum panels are available in lengths of ________feet.

A. 8, 9, 10, 12
B. 8, 10, 14, 16
C. 8, 9, 10, 12, 14
D. 9, 10, 12, 14

A
  1. C Page 9
26
Q
  1. Maintain a minimum temperature of ________during gypsum board application.

A. 30° F
B. 40° F
C. 50° F
D. 60° F

A
  1. C Page 105
27
Q
  1. _________, to prevent joint darkening.

A. Always use white paint in finishing
B. Always finish joints in humid conditions
C. Be sure joints are thoroughly dry before painting
D. None of the above

A
  1. C Page 383/392
28
Q
  1. _________after joint treatment are signs of edge cracking.

A. Straight narrow cracks along edges of tape
B. Cracks along edges of door and/or window opening
C. Cracks on edges of any curved application
D. Cracks along sides of pre-finished panels

A
  1. A Page 380
29
Q
  1. In large ceiling areas, ________ are recommended to relieve internal stress buildup.

A. Control joints
B. Seismic joints
C. Cladding joints
D. Stress joints

A
  1. A Page 355
30
Q
  1. Structural movement and most cracking problems are caused by __________ .

A. Change in materials due to temperature and humidity changes
B. Deflection under load
C. Seismic forces
D. All of the above

A
  1. D Page 354