Electrical Flashcards

1
Q

What items are working when you connect the battery?

A

Master Caution and Annunciator Panel
Interior and some exterior lights
Avionics Essentials
Fuel Boost Pumps
Engine Start System
Hydraulic System Controls
Flaps and Gear Indicators

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is on the HBB (Hot Battery Bus)

A

LIVE
L = 5 Lights
I = Ignition
V = Volt Meter
E = ELT + Emergency Battery Packs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What Happen when you connect the GPU?

A

Closes the Power Relay connecting Starter Generator to the respective Main Bus

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What amperage and voltage should the GPU be set to?

A

800 to 1000 amps and 28V with a continuous supply of 300 to 400 amps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is happening when you connect the GPU?

A

Charge the Battery

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the voltage required to start the Aircraft

A

24V

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the battery starting limits?

A

3 starts per hour
3 generator assisted starts is equal to 1 Battery start (ie: 1 x XGen Start is equal to 1/3 of a battery start.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

At what N2 % does the start cycle end?

A

38% N2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

How do you know the current limiter is blown?

A

Compare left and right bus voltage.
If one side is significantly different, it could be due to an open current limiter.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What will happen if the current limiter is blown?

A

The battery disable relay open the battery relay.
The high amperage then only flows through the HBB from the operating generator to augment the battery during the start.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is the maximum amperage output of the generators?

A

450 Amps for 5 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What do you do if you lose DC Power?

A

Shed loads and go to the checklist.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the Battery over-temp procedure?

A
  1. Note Amperage
  2. Battery Switch to Emergency
  3. Amperage, note the decrease
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How do you perform the Inverter test?

A

Trip the respective inverter simulating a DC power failure. You will get a AC annunciation light along with Inverter Fail light 1 or 2.
The failure of either inverter triggers and AC Fail.
Reset the master warning will extinguish the AC Fail annunciator unless both inverter lights are illuminated.
Do this to both inverters individually to simulate the DC failure.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What happens when you select inverter 1 ?

A

The Inverter FAIL annunciator light will come on along with AC Fail Light.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly