Clean Air Act: Air Quality Sampling and Source Emission Testing Flashcards
in large or environmentally significant existing source, a boiler must be rated at ___________ and a diesel generator rated at ____________
boiler: 251 hp
diesel generator: 1250 kW
each test must consist of _____ run sampling
three
for legal basis: MC 2007-03 (small source). testing should be done during the _____ year of its operation, thereafter, tested once every _______ year
first; second
guidelines on the Issuance of Permit to Operate (PTO) for Air Pollution Source Installation or Equipment (APSI/APSE)
Memorandum Circular 2020-17
there are three objectives of MC 2020-17. one of them is to strictly implement the __________ under Rule V of RA 11032
Zero Contact Policy
another objective of MC 2020-17 is to harmonize the process flow in the application through the use of ________
Online Permitting and Monitoring System (OPMS)
the last objective of MC 2020-17 is to provide______ for the processing of application through OPMS
Time and cost-efficient procedures
OPMS for Permit to Operate Air was effective last _______
May 28, 2020
refers to a backup electrical system that operates during an outage to transfer the electrical load and supply power to circuits
Standby generator sets
standby g.s. shall not be required to conduct source emission testing when it is operating not more than _________ hours annually for light commercial and industrial operation (hotels, malls, banks, etc.)
200
standby g.s. shall not be required to conduct source emission testing during these scenarios:
- emergency hotel operations
- rescue related to natural calamities
- conflict areas (war and terrorist attacks)
- all activities affecting national security
generator set are required to conduct source emission testing when the g.s. is used in __________ and uses __________.
Peaking power plants; Bunker fuel oil (BFO)
all applicants covered under Section 2 of this Memorandum Circular shall be required to submit their updated Environmental Monitoring Plan (EMOP) within __________ from the effectivity of this Memorandum Circular.
30 days