Clean Air Act: Air Quality Sampling and Source Emission Testing Flashcards

1
Q

in large or environmentally significant existing source, a boiler must be rated at ___________ and a diesel generator rated at ____________

A

boiler: 251 hp
diesel generator: 1250 kW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

each test must consist of _____ run sampling

A

three

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

for legal basis: MC 2007-03 (small source). testing should be done during the _____ year of its operation, thereafter, tested once every _______ year

A

first; second

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

guidelines on the Issuance of Permit to Operate (PTO) for Air Pollution Source Installation or Equipment (APSI/APSE)

A

Memorandum Circular 2020-17

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

there are three objectives of MC 2020-17. one of them is to strictly implement the __________ under Rule V of RA 11032

A

Zero Contact Policy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

another objective of MC 2020-17 is to harmonize the process flow in the application through the use of ________

A

Online Permitting and Monitoring System (OPMS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

the last objective of MC 2020-17 is to provide______ for the processing of application through OPMS

A

Time and cost-efficient procedures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

OPMS for Permit to Operate Air was effective last _______

A

May 28, 2020

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

refers to a backup electrical system that operates during an outage to transfer the electrical load and supply power to circuits

A

Standby generator sets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

standby g.s. shall not be required to conduct source emission testing when it is operating not more than _________ hours annually for light commercial and industrial operation (hotels, malls, banks, etc.)

A

200

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

standby g.s. shall not be required to conduct source emission testing during these scenarios:

A
  1. emergency hotel operations
  2. rescue related to natural calamities
  3. conflict areas (war and terrorist attacks)
  4. all activities affecting national security
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

generator set are required to conduct source emission testing when the g.s. is used in __________ and uses __________.

A

Peaking power plants; Bunker fuel oil (BFO)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

all applicants covered under Section 2 of this Memorandum Circular shall be required to submit their updated Environmental Monitoring Plan (EMOP) within __________ from the effectivity of this Memorandum Circular.

A

30 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly