Check Check Dumbass Flashcards
for those of us who can't read a checklist
PTO -1
Low Rotor RPM
NR is below 96%
PTO -1
ENG OUT Audio
NG is below 55%
PTO -1
How long can you defer a HIT check for?
Why would you defer it?
5 hours
While operating in adverse conditions, (dust, desert, coastal beach area, dry river beds) it may be delayed until a suitable location is reached.
PTO -1
When shall pitot heat and anti-ice be on?
Visible Moisture with ambient temperature of 4 C and below.
PTO - 1
NOTE About ADHEELS
The ADHEELS power source is an internal battery that is not rechargeable; to conserve the battery the light strips must be off during non-emergency activities.
PTO - 1
WARNING Associated with low charge or malfunction N0. 1 battery
It could prevent proper APU operation and loss of fire fighting capabilities on the No. 1 engine and APU, in addition to reducing battery only time available.
PTO - 1
How long do you have to apply APU or external power after turning the batteries on?
60 seconds
PTO - 1
Fire Detector Test
What does Position 1 vs Position 2 detect?
Position 1: (wall sensors) APU, and both engines
Position 2: (floor sensors) just engines
PTO - 1
Fire Detector Test
Walkthrough with times
Position 1: APU fire T-handle, both engine fire t-handles, master warning panel FIRE illuminate within 1 second
Position 2: APU fire T-handle extinguishes in 5-6 seconds, other lights remain
OPER: all fire warning lights extinguish in 5-6 seconds
PTO - 1
How long does it take for the CMWS to boot up? Why do we care about it on startup?
Up to 2 minutes and 30 seconds
If we transition power from APU gen to main generator while it is booting it can cause damage and or system resets.
PTO - 1
What EDECU signal validation code indicates that the DAS plug is installed?
25 +/- 3%
PTO - 1
When we release the lamps test button what is happening?
Steady audio tone is heard for 2 seconds
Audio tone comes on a second time as the system checks the DCUs individually
PTO - 1
When is the cold weather control exercise required?
-17 C and below
PTO - 1
When is the Cold Weather Force Generators Warm-Up Required?
To clear the following faults
FG1/FG2/FG3 MUX1 THERM
FG1/FG2/FG3 MUX2 THERM
PTO - 1
Stabilator Check Walkthrough
- Indicates 38-41
- TEST button - Indicator moves 5-12 degrees trailing edge up (manual audio is heard in 3 beep cycles)
AUTO CONTROL RESET (audio is off, caution extinguishes, indicator resets to 38-41) - Cyclic slew - Indicator moves 15 degrees each (we can now reset the MASTER CAUTION for manual audio tone)
- Manual slew - Indicator shoes -6 to -10 degrees
- Manual slew - Indicator shows 0
- Auto control - Indicates 38-41 (caution extinguishes)
PTO - 1
Start Abort Criteria `
- No TGT increase (light off) within 45 sec
- No P within 45 sec
- No NP within 45 sec
- ENG STARTER ON caution extinguishes before 52-65% NG
- TGT reaches 851 before >63 % NG
PTO - 1
What does TGT have to be below before advancing PCLs?
30
PTO - 1
Hydraulic Leak Test Lights
- 2 Master Cautions
- 3 Res Low
- 2 tails (T/R SERVO 1 FAIL caution and T/R SERVO 2 ON)
- Boost Servo Off
- SAS Off
- Back Up Pump On advisory
PTO - 1
How long do the Hydraulic Leak Test Lights have to come on?
3-5 seconds
PTO -1
Which section requires a CHALLENGE/RESPONSE - RESPONSE method?
Section III Emergency Procedures
PTO -1
Does the information in the parenthesis of a checklist step need to be verbalized?
No
PTO -1
What is said in reference to checklists steps being omitted?
Items of a checklist not applicable to the model, series, or configuration being operated may be omitted.
PTO -1
What is different about the CL 2 checklists?
They don’t need to be verbalized just notify the crew upon initiation and completion of checklist.
PTO -1
When will TOLD be computed and briefed?
Prior to takeoff.