Chartlet #4 Flashcards
Latitude 33°46’N
・Hits the corner of the lifted base of the finger piers off the nose of the Wilmington marina peninsula.
・Intersects the throat of the peninsula for the Wilmington marinas at the exact spot that 118°15’W does.
・Intersects slightly to the N of the forward edge of the shark fin cut.
・Hits the corner of Pier D 2mm to the north of the small flat western face.
Longitude 118°15’W
・ Just slices the W end of the Holiday Harbor peninsula
・Hits the SE corner of the for pier in the throat of the Wilmington marinas peninsula.
・Crosses 33°46’N just inland of the location where 33°46’N intersects the throat of the peninsula for the Wilmington marinas.
Longitude 118°14’W
・Crosses the N face of Cerritos Channel 51.8mm from Dock 90 (E side of face).
・Longitude Spacing: 128mm.
Longitude 118°13’W
・3.8mm to the E of the long nub on the north side of Pier C.
・Intersects the E-most edge of the drydock cut (W-most cut) of Pier D.
East Basin Channel Cable & Pipeline Area
・Line #4: Starts 2mm N of corner between East Basin Channel and Slip N. 5. Perpendicular to docks on SE face of Mormon Island (2 degrees flatter).
・”Cable & Pipeline Area” between Lines #3 and #4.
East Basin Channel and East Basin S Channel Lines
3mm from land, as usual, unless otherwise specified.
Magenta Line N of East Basin Channel
Line starts at corner of SE Channel line between East Basin Channel and East Basin. Goes toward tip of Pier 190.
East Basin NE Channel Line
Starts from NW Channel Line 1mm to the E of due N of S-most corner of long notch near Dock 210. 147° to Cerritos Channel North Line.
Cerritos Channel North Line
・5mm off and parallel to the flattest stretch of land on the S side of the Newmark’s peninsula.
・Touches the tip of Barb’s 3rd finger pier (has perpendicular piers off it).
・Runs at 3mm off until in line with face of Docks 87-84 on Pier B.
・Follows right on the face of this line until a perpendicular line will aim directly at NW corner of Pier C.
・Runs along this perpendicular line briefly before turning to be 3mm off the W edge of Pier C.
・This line continues until Due W of the bottom of the W-facing flat face on Pier D (Dock 38).
Cerritos Channel S Channel Line
・3mm off Docks 210-206 on Pier S. Stops at E corner of Dock 206.
・Starts 3mm off Dock 100, but runs parallel to Docks 96-90 on north side of channel (flat section E of Henry Ford Bridges).
・Stops at a point that is 1mm E of Due N of the upper corner of West Basin.
Back Channel W Channel Lines
・Runs from Cerritos S Channel Line to just N of S Can Opener Lt.
・Continues at 4mm off the face of Docks 118 and 119 (further down in the channel). Stops 4mm past the edge of Dock 119.
・Turns perpendicular to the W for 3mm.
・Runs parallel to the face of the small corner turn.
・Intersects with line that runs across the face of the structures off Dock 121.
・Turns and stays 4mm off face of Docks 122 & 123.
Back Channel E Channel Lines
・The line that ends off Dock 38 angles over to meet next line, which starts W of the corner between Docks 37 & 36.
・Runs 3mm off Docks 34 & 33 on Pier D.
・Runs perpendicular out 1mm at the same location that the W Channel Line turns perpendicular.
・Then runs 4mm off Docks 33 & 32 on Pier D.
・Runs until it is due N of the flat western face of Pier F. ・Turns towards tip of Navy Base Mole (2mm to the W of tip).
Unmarked bridge over Dominguez Channel
・At end of Consolidated Slip. Starts just E from the top corner at the mouth of the Dominguez Channel.
・Crosses at 337°.
・3mm wide.
- Consolidated Slip Buoy “4”
Due E of notch between Docks 200B&C, 1mm E of Due N of the point at Dock 200Z.
- West Part of Docks Lt. “2”
In line with N-most Newmark’s Slips, in line with NWxN pointing finger pier at the end of your dock.