Ch 19 Buildings Under Construction, Renovation and Demolition Flashcards

1
Q

There are two types of hoist on the job site what are they? Pg 484

A

One for people and one for materials and equipment only

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Older buildings undergoing demolition pose an extra hazard to fire fighters asbestos abatement. This is common before what year? Pg 485

A

1975

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

OS&Y are found where? Pg 486

A

150 ft of building height (every 15 floors in residential buildings, every 10-12 in commercial buildings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are tilt slab buildings? Pg 487

A

In which huge slabs of poured concrete are erected as the exterior walls.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When fireproof coatings or membranes are missing what happens? Pg 487

A

Steel may be exposed to rapid rises in temperature, which can lead to failure.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

One of the most dangerous buildings in the US to fight a fire is what? Pg 491

A

Vacant building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The firefighter death rate at a vacant building fireis more than how many more than a occupied residential building? Pg 491

A

3-5 times

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A empty square near the entrance means what? Pg 492

A

The building is of normal structure stability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A box with a line drawn diagonally through it means what? Pg 492

A

Some Serious hazard, such as holes in the floor and signals that all operation should be conducted from the exterior if possible.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

A building marked with an X means what? Pg 492-493

A

Building with severe hazards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is used by the FDNY to mark vacant buildings? p. 492

A

Painted square

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

How many floors may need to be laddered if the fire occurs at a construction site after working hours?
p. 483

A

One

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Where should the stream be applied first when battling fire in a building under construction? p. 483

A

Upper floor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Which fire protection system should be present within two floors of the highest level under construction?
p. 486

A

Standpipe riser and outlets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the stream of choice at buildings under construction when the fire can be reached? p. 482

A

Elevated platform

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What is being removed from the concrete that causes spalling? p. 490

A

Water

17
Q

Which is NOT correct about buildings under construction? p. 482

A

Power is left on overnight to allow for security lighting

18
Q

Which part of the hung ceiling often is not installed until much of the rest of the construction is completed and the occupants have begun moving in?
p. 487

A

Tiles

19
Q

How many more times the number of firefighter deaths occur in vacant buildings than in occupied residential
buildings? p. 491

A

3-5 times

20
Q

What is done to protect the tensioning cables once the concrete has hardened and the cable ends are cut off? p. 488

A

Concrete is poured over the ends

21
Q

Approximately what amount of time must pass before the poured-in-place reinforced concrete building can support its own weight? p. 488

A

48 hours

22
Q

What should be done when fighting fires in areas where LP cylinders are present? p. 485

A

Use large streams from shielded locations

23
Q

What type of strength do the cables embedded in pretensioned concrete provide? p. 488

A

Tensile

24
Q

What is the easiest way to determine if a hoist is for transporting people at a construction site? p. 484

A

Controls inside the car

25
Q

What type of standpipe system will be present in most buildings under construction, at least temporarily?
p. 486

A

Nonautomatic dry

26
Q

Approximately how many days does it take concrete to reach its greatest load-carrying capacity? p. 489

A

28

27
Q

What distance are the 4X4 posts placed in each direction to support the weight of the concrete in poured-in-place reinforced concrete buildings? p. 489

A

4 feet

28
Q

At what interval are the riser sectional valves usually found in commercial buildings? p. 486

A

10-12 floors

29
Q

What is seen on a building that is vacant and has severe hazards? p. 492-493

A

Square with an “X” in it

30
Q

What type of force is being exerted on the wall when it is load-bearing?
p. 487

A

Compressive

31
Q

Which is one of the most dangerous buildings to operate in in the United States? p. 491

A

Vacant buildings

32
Q

In which type of building is the most serious collapse threat found while it is under construction? p. 488

A

Poured-in-place reinforced concrete

33
Q

Which outlet should fire-arriving units test for water at a building under construction or demolition? p. 486

A

First floor

34
Q

High-rises built before what year will have an added hazard of asbestos exposure? p. 485

A

1975