To where does CEDMCS send signals on a Reactor Trip?
Main Turbine for tripping DFWCS for RTO SBCS for QOB ERFDADS for indications SRP Downtown
How long does it take to drop rods 90%?
4 seconds
What powers the CEDMCS cooling fans?
NGN-L17
How many CEAs are in a subgroup?
4
Except the one that has 5
What does the Plant Computer supply to CEDMCS?
Upper Group Stop Lower Group Stop Sequential Permissive Upper Sequencing Limit Lower Sequencing Limit
What does RRS provide to CEDMCS?
Rate and Direction Signals
How many reed switch assemblies and voltage ladders are there per CEA?
2
How far apart are the reed switches on a CEA?
1.5 inches
How far is one step for a CEA?
0.75 inches
At how many steps does the Upper Electrical Limit occur?
200 steps
At how many steps does the Lower Electrical Limit occur?
1 step
What functions does the Dropped Rod Contact serve in CEDMCS?
- The rod bottom light on B04
- Tells the Plant Computer to zero the pulse counters.
If the Upper Latch Coil on a CEA is at a reduced voltage, is it holding or latching/moving?
Holding
What does CWP stand for?
CEA Withdraw Prohibit
What does AMI stand for?
Automatic Motion Inhibit
What does AWP stand for?
Automatic Withdraw Prohibit
Which rod inhibition can be bypassed?
CWP
When is a CWP enacted?
2/4 High Pressurizer Pressure Pre-Trip 2/4 Low DNBR Pre-Trip 2/4 High LPD Pre-Trip RPCB CEA Misalignment from CPCs/CEACs
When is an AMI enacted?
- > 5% deviation between redundant indicators for TLI, Reactor Power, and Tave when AVERAGE is selected on RRS
- Whenever Reactor Power < 15%
- When TLI < 15% and Reactor Power is below the lesser of
- SBCS availability + TLI or…
- AMI threshold setpoint.
When is an AWP enacted?
- Tave > Tref by 6F
- Tc > 575F
- SBCS Demand
What are the power supplies to the CEDMCS MGs?
NGN-L03
NGN-L10