Auxiliary Power Unit Flashcards
Max permissible load on the APU Generator
40 KVA to 41,000ft
Max altitude for starting the APU
37,000 FT
Max altitude for APU operation
41,000 FT
Max altitude for APU bleed air extraction
25,000 FT
Max speed with APU door open
220 KIAS if APU not operating
Vmo/Mmo if APU is operating
What battery voltage is required before starting the APU
22 volts on both Main and APU batteries
What does the main battery power during an APU start
APU ECU
What does the APU battery power during an APU start
Cranking of the 28 VDC start motor
When will the AVAIL switch light illuminate on the APU
99% RPM plus 2 seconds
What are the priorities of the APU?
Primary: Electrical
Secondary: Pneumatics
When will the START portion of the START/STOP switch light extinguish on the APU?
46-60% APU RPM
What are the APU starter limits?
No more than 3 start attempts in one hour.
2 Minutes delay between start attempts
What type of APU is used on the CRJ 900?
Allied-Signal RE220