AC Power Flashcards

1
Q

If the aircraft ac generators are online and ground ac power is applied what will happen?

A

The aircraft supplies will take priority.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the purpose of the AC Load shedding relay?

A

To connect and disconnect busbar 2A for load shedding purposes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which system is supplied by the 26v AC transformers?

A

Altitude and heading reference system (AHRS).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

At what stage to the AC Generator control units (GCU’s) bring the generators online?

A

92% Np (370Hz)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Where are the alternating current generators located?

A

On a step up gearbox on the accessory gear box.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What Np does the AC generators come online at?

A

92%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

If you have an AC external power caution what does it mean?

A

The starter master is on.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What Np do the frequency detect relay de-energise?

A

92% NP (370Hz)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly