81-100 Flashcards
Recite PITCH TRIM RUNAWAY MI. Is this emergency addressed by the QRC? What section of the QRH is it?
AP / TRIM DISC Button - Press and hold
PITCH TRIM SYS 1 & 2 CUTOUT BUTTONS - push
It is an emergency- Non annunciated section of the QRH
How would you alleviate excessive pitch up tendencies with a PITCH TRIM RUNAWAY?
Continuous banks up to 30 degrees
Recite Roll (YAW) TRIM RUNAWAY MI.
AP / TRIM DISC Button
- Press and hold
Recite STEERING RUNAWAY MI
STEER DISC SWITCH- Press
Steer the airplane using the differential braking and rudder
When performing the SAFETY AND POWER UP CHECKLIST, which display units should be powered?
Screens 2, 3, and IESS
What information is displayed on Display unit 2 when you first power up the aircraft?
Status page
Why must battery voltage be checked before applying AC power?
So we can identity if our batteries have sufficient charge to handle an electrical emergency
If Batt 1 is 22.5v and Batt 2 is 21.4v, what action must you take?
Recharge the batteries using the procedure in the SOPM. (SOPM 04-01.7)
What is the battery charging procedure?
Recharge batteries using any AC power source. The time it takes to recharge is based on Batt Temp. This procedure can only be used when the Batt voltage is between 21.0 and 22.5. If less than 21.0 call MX.
(SOPM 04-01.7)
What is the purpose of charging the batteries prior to takeoff?
In an electrical emergency, while the RAT is not deployed the batteries can provided 10 minutes of power. (AOM 14-05-15)
What should the pilot check prior to conducting a fire panel test?
Verify no fire protection fail messages on the EICAS. (SOPM 04-01.8)
Describe what comes with the fire panel test.
6 lights on overhead: Both fire handles, Cargo smoke FWD/AFT, APU button, upper half of APU EMER STOP
5 EICAS messages: CARGO FWD(AFT) SMOKE, APU FIRE, ENG 1(2) FIRE 2 FIRE indications inside ITT
2 Master warning lights
2 Aural warnings: Triple chime and fire bell
(SOPM 04-01.8)
How do you determine if the AC power supplied by the GPU is within proper limits?
If the GPU button AVAIL light is illuminated the power is within proper limits. The plane checks for correct voltage/amperage/frequency automatically.
(AOM 14-05-10)
Upon establishing AC power on the aircraft, what test should automatically start?
Electric P-BIT
(SOPM 04-01.11)
When does the elec PBIT auto start? How long does it last? What can interrupt it?
E-PBIT automatically starts when an initial AC source is introduced.
It’s takes 3 minutes to complete
3 things interrupt it: any hydraulic pump is on, flight control modes switches are cycled, AC power is interrupted
(SOPM 04-01.11)