5.1 Control Plan Flashcards

1
Q

Why do we calculate both short and long term capability?

A

Short term capability is based on assumptions, long term capability has extra unknown sources of variability. We usually assume a process will shift by 1.5 sigma over time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the difference between leading and lagging indicators?

A

Lagging indicators report what has happened. Leading indicators suggest what will happen.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is FMEA?

A

Failure Modes and Effects Analysis. It’s a way of categorizing possible failures in a process and estimating the frequency, visibility, and severity of those failures.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are three key elements of good training?

A

Set objectives for learning, Communicate relevant information, Assess the trainee to ensure they’ve learned the information.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which piece of the continuity plan ties them all together?

A

The training plan brings everyone up to speed on all of the relevant changes, including the rest of the continuity plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly