(2025 EXAM) Man 10 DIV AND HYPERB SYS CERT Flashcards
chap 2,3. Appendix A,C
- Who can close out a CWP?
-Diving Officer/SDS
Who can approve temporary alternative system alignment with adequate tag-out procedure while the rec remains open?
CO or designated rep
How do you document rework in the REC log?
place a - after the original rec number ex.24-001-1
How often do you audit rec logs?
Quarterly
O2% greater than what % requires O2 worker qualification?
25%
Valve seat tightness time and pressure?
30 minutes plus time to inspect at MOP
Hydrostatic/pnuemo test?
1.5 times MOP. No leakage allowed
System Drop Test all requirements?
->1000psi air 24 hours, 1% of initial pressure
-<1000psi air 6 hours, 5% of initial pressure
-Helium/HEOX 24 hours, 1% of initial pressure
-O2 24 hours, 0 allowable drop
What is all rope required to have?
Certificate of break
Service life of wire rope?
5 years
Static test for DHS?
200% for 10 minutes
Dynamic Test?
150% run through 3 complete cycles of operation
What do you do with rope that has exceeded 75% of its minimum breaking strength?
Discard
Replacement criteria for Wire rope?
6 broken wire in one rope lay length, or three broken wires in one strand lay length
Category 1A card?
Corrective action must be accomplished prior to manned use of the system. Results in termination or suspension of existing certification.
Category 1B card?
Corrective action must be accomplished prior to system certification.
Category 1C card?
Corrective action must be accomplished prior to the date or event specified on the card to sustain certification.
Category 1D card?
Corrective action must be accomplished on a specified component prior to its use, but overall system retains its certification.
Category 2 card?
Corrective action is desirable, but no mandatory.
How far out must the applicant request the SCA for an on site survey?
no less than 90 days prior to desired cert date
How long can a cert extension be for?
normally up to 90 days
Extensions 30 days or less can be granted via?
email. Longer extensions require formal approval letter from SCA.
Who provides the SCA with all information for the initial certification of a system?
Project Manager (PM)
What is MIL-STD-882?
Standard Practice for System Safety, provides an acceptable set of guidelines for the conduct of hazard analyses.
Who is needed to approve a REC?
REC Supervisor and Diving Officer/Senior Diving Officer
Who is needed to close a REC out?
REC SUP, DO/SDS and CO.
What is a Static load test?
200% of operational load of the handling system held for 10 mins.
If galvanized wire rope is used, reduce the nominal breaking strength by ___ percent to account for the effects of galvanizing.
10%, Unless drawn galvanized wire is used, then no reduction required.
How often shall DHS have a static, dynamic and rated load test conducted?
After being installed, overhaul, not to exceed 5 years.
Dynamic load test are what percent of the rated load of the handling system?
150%
Criteria for Rated load test?
100% rated load, cycled through operations three times.
Hydros are what percentage of Max operating pressure?
150%
What are synthetic line eye splices pulled-tested to?
200% designed load.