Diving Systems Certification is NAVSEA Code?
OOC4
IAMIS is part of what ORM process?
Deliberate
Time critical risk management four step process? A-B-C-D model:
Asses the situationBalance ResourcesCommunicate risk and intentions *Do and Debrief
DP2 Configuration 1 & 3 max depth limit. No Decompression?
190
KM37 normal working limit?
190
KM-37 maximum depth limit?
285
For DOD civilian divers, what is required for planned Decompression dive regardless of depth?
A emergency gas supply
Standby diver may be deployed as a working diver provided all of the following conditions are met:
- No-Decompression dive of 60fsw or less* same job/location * Shall be determined safe by first diver on site* UWSH or UCT work, Salvage not authorized
EGS Requirements:
Mandatory at depths deeper than 60FSWAnd in enclosed spaces. Can use a 50-150Ft whip (overbottom pressure set to 150psi) 1st stage regulator set to manufacture recommendations, but not lower than 135 psi. Relief valve set at 180 +/- 5 psig
MK-20 overbottom pressure?
90 psig
The DP-2 is good down to temperatures of ___ degrees Fahrenheit?
29°F
For dives using the DP-2 deeper than 60FSW, standby must have his own dedicated DP-1.
Max current in DP-2?
1 knot
LWDS flask FV and SCF?
.935 ft3 191 SCF @ 3000 psi
ASRA flask FV and SCF?
3.15 Ft39671 SCF @ 5000 psi
The stage line shall be ____” double braid, or ___” wire rope minimum?