  1. Who can close out a CWP?
A

Diving Officer/SDS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who can approve temporary alternative system alignment with adequate tag-out procedure while the rec remains open?

A

CO or designated rep

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

How do you document rework in the REC log?

A

place a - after the original rec number ex.24-001-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

O2% greater than what requires O2 worker qualification?

A

25%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Valve seat tightness time and pressure?

A

30 minutes plus time to inspect at MOP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How often do you audit rec logs?

A

Quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Service life of wire rope?

A

5 years

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Hydrostatic/pnuemo test?

A

1.5 times MOP. No leakage allowed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is all rope required to have?

A

Certificate of break

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

System Drop Test all requirements?

A

->1000psi air 24 hours, 1% of initial pressure
-<1000psi air 6 hours, 5% of initial pressure
-Helium/HEOX 24 hours, 1% of initial pressure
-O2 24 hours, 0 allowable drop

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Static test for DHS?

A

200% for 10 minutes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Dynamic Test?

A

150% run through 3 complete cycles of operation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What do you do with rope that has exceeded 75% of its minimum breaking strength?

A

Discard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Replacement criteria for Wire rope?

A

6 broken wire in one rope lay length, or three broken wires in one strand lay length

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Category 1D card?

A

Corrective action must be accomplished on a specified component prior to its use, but overall system retains its certification.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Category 1C card?

A

Corrective action must be accomplished prior to the date or event specified on the card to sustain certification.

13
Q

Category 2 card?

A

Corrective action is desirable, but no mandatory.

13
Q

Category 1A card?

A

Corrective action must be accomplished prior to manned use of the system. Results in termination or suspension of existing certification.

14
Q

Category 1B card?

A

Corrective action must be accomplished prior to system certification.

15
Q

How far out must the applicant request the SCA for an on site survey?

A

no less than 90 days prior to desired cert date

16
Q

Extensions 30 days or less can be granted via?

A

email. Longer extensions require formal approval letter from SCA.

17
Q

Who provides the SCA with all information for the initial certification of a system?

A

Project Manager (PM)

18
Q

How long can a cert extension be for?

A

normally up to 90 days