175 Matrix/ DTS Flashcards
SAFETY AND POWER UP
Is what type of Checklist?
Read and Do
Silent Checklist
When do we have to do the SAFETY AND POWER UP CHECKLIST?
The safety and power up checklist must be performed for every crews first flight of the day on a particular airplane, or when a power down was required.
When receiving the airplane already powered up, verify compliance with all items and perform FIRE EXTINGUISHER panel check
Battery 1 and 2 ON/AUTO
What do we check?
- IESS 90 sec to Initialize
- Screens 2 and 3 only
- Check Batt 1-2 voltage
22.5 Okay
21.0 SOPM procedure
Below 21.0 Call MX
EMERGENCY EQUIPMENT
DOORWAY
- PBE
- Halon Fire EXT
- Crash AX
FLIGHT DECK EMERG EQUIP
OBSERVER
- Observer Seat. Secure
- Observer O2
- Observer headset
FLIGHT DECK EMER EQUIP
CAPTAIN
- Flashlight
- Life vest
- Jump seat vest
- Circuit Breakers
- Escape rope
FLIGHT DECK EMERG EQUIP
FO
- Flashlight
- Circuit Breakers
- Life Vest
- Escape rope
- Safety pins Gear/Rat
FLIGHT DECK DOCUMENTS
- QRH
- QRC
- Airworthiness Certificate
- Aircraft Radio License
- Aircraft Radio License
- MX Can
BEFORE FIRE TEST
- 30 sec for EICAS to populate
2. No Fire Fail msg.
WHAT KIND OF CHECKLIST IS THE ORIGINATING CHECKLIST?
Flow Challenge and Response
When do we do an ORIGINATING CHECKLIST?
- FFOD either aircraft or crew
- Change of Crew
- Aircraft Swap
- Aircraft left unattended (flow switches test not required)
- Maintenance has been performed.
E-PBIT
- Starts
- Tests
- How Long
- Interrupts
- When AC source introduced
- Detects out of tolerant of FCM, P-ACE, SF-ACE
- 3 min
- A. Any Hyd pump turned on
B. Flt control buttons Cycled
C. AC power interrupted
H-PBIT
- Starts
- Tests
- Length
- Interrupts
- All 3 Hyd pumps pressurized. If turning on pumps should start with 3 then 1 then 2 in that order. (Like when starting engines). Also starts after engines are started.
- Tests Hyd components of the Fly By Wire
- 1 min
- Any Flt control surface movement.
When can we perform the BEFORE START CHECKLIST TO THE LINE?
- Fueling is complete
- ATC clearance received
- To The Line Tasks and flows complete
When can we do the BEFORE START CHECKLIST BELOW THE LINE?
- Manifest is complete and T/O data has been computed
- Below The Line Tasks and flows complete
- FA reports “ready to taxi”
- All doors are closed