What is the difference between a contract administrator and a clerk of works?
A
A clerk of works tends to be used on larger projects and inspects the works and reports to the contractor. They do not have any role in administering the contract.
2
Q
At collegiate crescent how did you identify the wrong paint had been used, what paint had been used and what was specified?
A
I identified the wrong paint was being used during a site inspection.
I had specified dulux trade mould shield as it has moisture and mould resistant properties and it was being applied in a high moisture environment.
The contractor has used a leyland trade contract matt.