Overall responsibility for complying with API 510 (4.1)
Owner/User
During Repairs and Alterations - Responsible for Quality Control (4.2.3)
Repair Organization
Assure owner - testing, inspection & examination activities meet Code (4.2.4)
Inspector
Evaluate and accept NDE examination results (4.2.4)
Inspector
Develop the Inspection Plan for Vessels & Relief Devices (5.1.1.1)
Inspector OR Engineer
Review the Inspection Plan for equipment operating at elevated temperature (5.1.1.1)
Corrosion Specialist
Choose to conduct RBI assessments (5.2)
Owner/User
Review prior vessel history prior to inspections (5.3.4)
Inspector
Familiar with characteristics of potential damage mechanisms (5.4.2)
Inspector
Perform Internal Inspection (5.5.2.1)
Inspector
Determine whether it’s necessary to remove deposits or lining (5.5.2.3)
Inspector AND Corrosion Specialist
Perform On-Stream Inspection (5.5.3.1)
Inspector OR Examiner
Approve On-Stream Inspection work performed by Examiners (5.5.3.1)
Inspector
Perform External Inspection (5.5.4.1.1)
Inspector OR Qualified Others
Take Thickness Measurements (5.5.5.1)
Inspector OR Examiner
Review corrosion data if short-term corrosion rate varies significantly (5.5.5.3)
Inspector AND Corrosion Specialist
Assure those taking thickness measurements are trained and qualified (5.5.5.4)
Owner/User
Determine locations of CMLs for vessels with localized corrosion (5.6.3.1)
Corrosion Specialist
Involve if the # of CML’s will be signigicantly reduced or eliminated (5.6.3.2)
Corrosion Specialist
Determine type of expected damage and select NDE method (5.7.1)
Inspector AND Engineer or Corrosion Specialist
Perform UT flaw detection for finding linear flaws (5.7.1.2)
QUTE - API Certified UT
Determines when a pressure test is needed after a repair - “believes” (5.8.1.1)
Inspector
Review use of a component pressure test in lieu of complete vessel hydro (5.8.1.2)
Engineer
Determine the test pressure for non-code related pressure tests (5.8.2.2)
Owner/User
Hydro of 300 SS, verify water quality and that vessel is drained and dried (5.8.4.2)
Inspector
Approve substituting NDE for a pressure test (5.8.7.1)
Inspector AND Engineer
Verify new materials are consistent with those specified (5.9.1)
Inspector
When verifying new materials, determine the sampling percentage (5.9.1)
Inspector OR Owner/User
PMI new materials during repairs & alterations (5.9.1)
Inspector OR Examiner
If incorrect material found in existing vessel, determine amount of verification (5.9.2)
Inspector
Assess crack-like flaws attributed to environmental cracking (5.10.3)
Engineer OR Corrosion Specialist
Assess preferential corrosion in welds (5.10.3)
Inspector
Inspect new vessels at time of installation (6.2.1.1)
Inspector
Review and approve RBI assessments that extend intervals beyone 10 years (6.3.2)
Inspector AND Engineer
Determine the External & Internal Inspection Interval (6.4.1 & 6.5.1.1)
Inspector OR Engineer
Approve the use of On-Stream Inspection in lieu of Internal (6.5.2.1)
Inspector
Determine the Relief Device interval (6.6.2.1)
Inspector OR Engineer OR Qualified Others (PTV Tech)
Select which Corrosion Rate (short vs. long) reflects the current condition (8.1.1)
Inspector AND Corrosion Specialist
Maintain Vessel and Relief Device records (8.1.1)
Owner/User
Authorize all vessel repairs (8.1.1)
Inspector
Authorize all repairs to Div. 2 vessels 8.1.1)
Inspector AND Engineer
Authorize all alterations (8.1.1)
Inspecto AND Engineer
Designate hold point (fabrication approvals) (8.1.1)
Inspector
Repairs - Approve all methods of design, materials, WPSs, NDE & Testing (8.1.2.1)
Inspector
Alterations - Approve all methods of design, materials, WPSs, NDE & Testing (8.1.2.1)
Inspector AND Engineer
Approve all repair and alteration work at hold points (8.1.2.2)
Inspector
Approve all repair and alteration work at completion of work (8.1.2.2)
Inspector
Approve all nozzle installations (8.1.3)
Engineer
Allow temporary welded repairs to remain in place past “next opportunity” (8.1.5.1.1)
Inspector AND Engineer
Determine that a crack will not propagate from under a fillet weld patch (8.1.5.1.2.1)
Engineer
Approve the use of fillet-welded patch repairs (8.1.5.2.1)
Inspector AND Engineer
Approve use of lap band repair (8.1.5.1.3.a)
Inspector AND Engineer
Authorize the repair welding of cracks at stress concentrations (8.1.5.2.1)
Engineer
Review the repair procedures for SS Cladding (8.1.5.4.1)
Inspector AND Engineer
Monitor the repairs made to SS Cladding (8.1.5.4.3)
Inspector
Maintain record of qualified WPSs and WPQs (8.1.6.2.2)
Repair Organization
Allow exceptions to preheat temperatures (8.1.6.3)
Engineer
Monitor preheat temperatures (8.1.6.3)
Inspector
Review the use of a local PWHT in lieu of a full encirclement PWHT (8.1.6.4.1.a)
Engineer
Review the use of Preheat in lieu of PWHT (8.1.6.4.2.1.1)
Engineer
Review the use of controlled deposit welding in lieu of PWHT (8.1.6.4.2.1.1)
Engineer
Approve use of alternate NDE methods after repairs & alterations (8.1.7.3)
Inspector AND Engineer
Perform calculations for rerate (8.2.1.a)
Engineer OR Manufacturer
Oversee the attachment of a nameplate after rerating was performed (8.2.2)
Inspector