For digging a long distance trench 2’ x 10’, the best equipment to use is a
Bucket line trencher
what should you do if a pneumatic plate tamer is necessary
you should have a second grading crew follow the tamper to make any fills needed for the final trim
open graded asphalt concrete should only be rolled with a steel-tired 2 axle tandem roller weighing not more than
10 tons
Left blank
the best type of roller for ____ is rubber tired
sandy soils
an economical and fast system of removing trees is to use a loader or bulldozer with a bucket or shovel raised to the maximum height, pushing it against the tree until it falls. you do not use this procedure when
the procedure could damage another tree not intended for removal
the best piece of equipment for ripping asphalt 4” or less in thickness is a
gradder with attached ripper
tracks sinking until a dozer gets stuck is called
high centered
what is recomended where mud is moved by scrapers
move slowly into the soft area with the scraper bowl down. when the wheel slips, stop this allows the scraper to be pushed by the dozer
the most efficient way to place base material is to have
a controlled dumping procedure
when working with rock, you should not move or blade it much because of
the separation
what is a guinea hopper used for
cleaning hubs off
on large jobs, it is best to use a ____ rather than a grader
self propelled spreader
you must make the first compaction pass with a
sheepsfoot or self propelled steel pad compactor
to mix lime, you would use a machine like a rototiller because
it is fast and chews up the soil while adding water and mixing the lime and soil
when compacting clay soil you should use a ____ roller
sheepsfoot or pad type
the best way to remove asphalt pavement is with a
front loader
if the aggregate is slightly loose, the rubber tire paver is good for paving on aggregate base (T/F)
False
the spill off from the ends of the dozer or grader blade which forms a ridge of loose material is called a
windrow
the type of equipment to use if the ground is unstable when trenching is a
backhoe
trencher
shoring
the roller operator, when rolling paving subgrade sould look for
soft spots
the machine to use when excavating a vertical slope is
a clamshell
you would use compactors to compact 7500 cu yds of fill of an area 800’ long and 200’ wide and an area 200’ long and 30’ wide with 2500 cu yds of fill (T/F)
False
if there are no hindrances long the line, which of the following types of trench excavating equipment would be best for depths of 6’ or less
a wheel trencher
you know that equipment is having difficulty when working in mud if it
has a lugging engine
the operator can snake the scraper out by swinging the nose back and forth, if the mud is too deep or can
set the bowl down lifting the wheels
a method of cleaning the drum as it rolls, when it is picking up aggregate is to
attach cyclone fencing over the top half of the drum
what is one of the hardest pieces of equipmetn to pull out of the mud
a track dozer
what is the best peice of equipment to use in mud
a track rig
the contractor is working on a narrow fill where one of the highway lanes can not be closed. the scrapers are spreading the soil as they are filled, then the dozer operator moves the dozer and sheepsfoot out to the end of the fill when he sees the dump trucks coming, waiting until they have completed the dumping and left. the water truck follows immediately. He has proceeded how
incorrectly, since the scrapers dont spread the soil until they have all loaded and then put together moved into the fill area
breakdown rolling should be accomplished with a roller weighing at least ____ tons
12
initial or breakdown compaction should be accomplished with a roller weighing not less than
12 tons
what do you use a grader for
-trimming rough subgrade
-trimming slopes
-cutting ditches
when digging a 4’x5’ sloped trench best equipment to use is a
backhoe
mud pumping is done when
-the subgrade has a large amount of fine partiles
-the subgrade has too much moisture
when dealing with short runs, ie sewer service, the best peice of equipment to use is a
backhoe
though wheel trenches have a higher production rate than other trenching equipment, thye also have one shortcoming which is that they are limited to what
a 6’ depth and 24” width
working speeds for modern pavers usually range from ____. These machines which are supported on crawler treads can place a layer of less than 1” to approximately 10” inc thickness over a width of 6’ to 32’
10’ to 70’ per min
a ____ should be used when material being excavated is so loose or soft that a hoe cannot find a firm footing close enough to the edge of the trench to reach the bottom
dragline
the backfill material is generally returned to the trench by a ____, when a trenching job is handled mechanically
bull dozer, or doxer blade of excavator on smaller jobs
the simplest type of tailgate spreader is the
vane spreader
the best way of obtaining, from a vehicle tank, a sample of asphalt is by using
a sampling valve in the truck tank
the biggest benefit a dragline has over a hoe is
its greater reach
finish rolling is done with
-pneumatic tired rollers
-steel tired static weight tandems
the purpose of finish rolling is to
improved the surface
when there are no obstacles along the lines, a ____ is usually used for depths 6’ or less
wheel trencher
when a trench is very wide or the walls have to be sloped, you would use a
backhoe
of the followingm which are the four basic types of trench excavating equpment
hoe, dragline, wheel trencher, bucker line trencher
which of the following shoul dbe done first using a sheepsfoot, grid mesh self propelled roller
the subgrade
tow types of straight edges are
-rolling straight edge
-wood or metal straightedge laid on pavement
you should not hand rake unless
unless necessary
oscillating push rollers are to
cener the load to the paver
in placing asphalt course mistures in deep lifts, rock spreaders have not been successful (T/F)
False