Removals Flashcards

1
Q

what is the minimum depth that all stumps should be cleared away in embankment areas

A

2 ft below the original ground level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

which of the folowing does a contractor need to obtain if he enters into an agreement with an owner to dispose of material

A

licenses
environmental clearance
permits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

which of the following statements concerning the disposing of marerials outside the highway right of way is true

A

-the engineer must be furnished with teh satisfactory evidence rrequired before the contractor may dump any material
-the contractor must cover the cost if the department does not make the arrangements or he makes his own arrangements
-the department of transportation may make the arrangements for the material disposal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

if the construction is to be performed thoufh vineyards and cultivated areas, if there are treees to be protected the protection of those trees are at whose cost

A

the contractors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

what is the maximum thickness for chips of combustible materials which have been removed and are to be disposed

A

1/2in

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

what are 3 true statements regarding working rocks

A

-the based is called a boney grade because the rocks that come to the top with no fines to bind are often called bones
-when rock is moved, the fine materials tend to separate from the larger rock and leave the larger material without the binder needed to hold the rock in place
-rock should be movd or bladed as little as possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

if the entire length of the proect to the width specifications is to be cleared, there shall be no payemtn to teh contractor for clearing and grubbing outide of these limits unless such work is fauthorized by who?

A

the engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

clearing and grubbing shall consist of removing all objecionable mateials from within the

A

-areas through which ditches and channels are to be excavated
-highway right of way and bridge construcion areas
-road approaches and sited within the right of way

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

clearing and grubbing incluedes remoing the objectionable material from

A

above the surface of the area to be cleared

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

if cearing along the length of a channel or ditch (with the bottom width less than 12’) how far beyond the limit of the construction shall the area of clering extend?

A

2 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

clearing and grubbing means the removal of:

A

-all masonry and concrete
-all vegetable growth, trees and bushes
-all grass, weeds and uprooted stumps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

tree branches which hang less than _____ feet above the road surface must be removed

A

20

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

what is the contractor responsible for clearing in regards to clear and grub

A

stumps roots buried logs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

what is a drain installed under a roadway called

A

culvert

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

existing concrete must be removed to a depth below finish grade of at least

A

3 ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

when clearing and grubbing is done around highway construction areas, the area of clearing should extend how far beyond the edge of the construction

A

5 ft

17
Q

if the area to be cleared is within an embankment area where the grading plane is 2ft or more above the natural ground level

A

existing trees or stumps must be cut off not more than 1 ft above the natural ground level

18
Q

if an existing tree selected to remain is accidentally damaged you must

A

pay any cost related to the damage