Special Construction Flashcards
During the design and construction of radio and TV towers, which of the following provisions must be made to resist wind uplift
towers must resist 2 times the calculated wind uplift
dish antennas subject to the structural provisions of building codes are
antennas over 2 feet in diameter
for inspection, ____ are approved for providing ready access to TV towers
6 ft step ladders
which of the following must be provided, when an auxilary inflation system is needed for a membrane structure
an approved standby power-generating system
with regard to structural loads on radio and TV towers, which of the following is an accurate statement
towers must be designed for the dead load, wind loads as well as the ice load in regions where ice formation occurs
most building codes require that fire hazards caused by demolition activites and building construction work comply with
NFPA standards
the protection required for public sidewalks when being used by the public during construction demolition is
sidewalk sheds
sidewalk sheds and guard fences are required by the building codes. when must these safety barriers be installed
prior to commencing any type of construction
when a building is demolished, which of the following meets building code requirements with regard to party walls
the contractor of the demolished building is responsible for maintaining the security and usefulness of the party wall
Which of the following must public walks or walkways under sidewalk sheds comply with
such walkways must comply with the requirements for interior egress corridors and ramps
which of the following is a proper safeguard around the perimeter of a construction site
approved fences and barricades
if it becomes necessary to temporarily store materials on public property or to block existing roadways, the requirements of most localities is best described by which of the following
special permision is needed
which of the following best describes the requirements for existing utilities, prior to cemmencing demolition activites on any buildings
all utilities must be disconnected and capped off at a safe distance from where the demolition is taking place
if a building has been demolished and the site cleared, most building codes and local ordinances further require you to
provide safeguards to prevent waer damage to foundations of adjoining structures
another requirement for the vacant lot after demolishing the building is to
grade the site so that it conforms to existing adjoining grades
which of the following do most building codes base the requirements for construction materials and methods used for sidewalk sheds
the height of the building and the distance to the public street
when demolition activites cause toxic dust, which of the following is not a building code requirement
all workers must be protected against the dust, however it is up to the general public to stay away from the construction site
the demolition of a building may involve structural collapse, however, this would violate the requirement of most building codes. How is this problem generally taken care of?
a structural collapse is acceptable for building demolition
which of the following codes is used when enforcing new and replacement of water supply systems in high hazard zones
the national plumbing code
regulations and guidelines on the use of explosives for demolition projects and other building construction practices have been developed by which of the folloing Federal Departments
DOT
the maximum width allowed for a pedestrian walkway with or without an automatic sprikler system is
30ft