Metro rail red line:
The train configuration is set up with a minimum ____ car combination and up to ____ cars maximum.
•2 min and 6 max
Metro rail red line:
The train operator’s cab is in the ____ (“A” or “B”?) car
A
Metro rail red line:
How long is each train car?
75ft
Metro rail red line:
How wide is each train car?
10 ft
Metro rail red line:
What is the height of each train car?
12 ft
Metro rail red line:
How much does each train car weigh?
80,000 lbs
Metro rail red line:
The trains are propelled by four traction motors per car, operated from ___ Volts Direct current (VDC)
750v
Metro rail red line:
Batteries provide power for the auxiliary systems such as the train controls, doors, interior lights, and air conditioning system. The batteries are located under the ___ (A/B?) car and provide ____ volts.
- B
* 37.5v
Metro rail red line:
The trains “disconnect switch” for the auxiliary power is located inside of the battery compartment in car ____ (A/B?)
B
Metro rail red line:
Which part of the rail tracks provides the train with electrical power?
The 3rd rail
Metro rail red line:
How many double sliding doors are on each side of a dependent pair of cars?
6
Metro rail red line:
To gain access to a train from the outside, pull the External Emergency Door Handle near the center doors of the car, WAIT 5 seconds and then manually separate the doors. The handle will release which doors to be opened?
The center doors only
Metro rail red line:
Each car is equipped with how many extinguishers?
What is the extinguisher rating?
Two 10A/60BC extinguishers
One is located in the operators cab, and the other is located between the transverse arrangements in the passenger seats.
Metro rail red line:
The _____ Level is the first level below ground, which is the public access level to the tunnel
Mezzanine level
Metro rail red line:
The ____ level contains the different control rooms for the station functions such as the Train Communication and Control Room (TC&C), mechanical room, Department of Water and Power power station, and fan room. This level is not for public access.
Ancillary level
Metro rail red line:
The ____ room on the ancillary level will contain vital monitoring equipment such as the fire alarm panel, methane detector, and communication equipment (reset of fire alarms are done in this room).
Train Communication and Control room TC&C
Metro rail red line:
The DWP’s power station room is energized with _____ volts and should not be entered by Fire Department personnel.
34,500v
Metro rail red line:
For initial Fire Department operations, the most important area is the ____
Emergency Management Panel
Metro rail red line:
The EMP is located on the wall in the _____ Level, and is directly adjacent to the Fire Department’s lock box containing keys to the EMP and all station sites
Mezzanine level
Metro rail red line:
At the EMP, the accuracy of alarm information may be verified by contacting who? (The phone number is normally posted inside the EMP)
Rail Operations Center (ROC)
They SHALL be contacted prior to changing the functions of any system