Suspended Scaffolding Emergencies Flashcards

1
Q

What 3 types of suspended scaffold emergencies will units respond to

A
  1. Unoccupied swinging scaffold 2. Occupied stalled scaffold 3. Occupied hanging or off level scaffold
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which companies can an IC call for use of their high angle equipment at scaffold emergencies

A

Rescue and Squad

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which unit of the DOB can an IC request assistance from

A

Derricks and Crane Unit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

1st arriving units should contact a building representative to gather what 7 pieces of info

A
  1. Location of scaffolding 2. Access to scaffolding 3. Status of scaffold 4. Victims 5. Windows 6. Damage to building 7. Type of work being done on scaffolding
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

1st arriving units must evaluate what part of a scaffolding first

A

Anchor points

Note: Usually on roof but may be located on setbacks, shafts, or suspended from Building Maintenance Units

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

1st due units should evaluate and communicate to the IC what 3 things

A
  1. Scaffold anchoring system 2. Worker safety lines 3. Access to roof edge
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When the scaffold is occupied, ladder companies should respond with assigned tools and which 2 ropes

A

Lifesaving and Utility ropes

Note: Engines LSR may also need to be utilized

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What type of rope will be used to prevent an unoccupied swinging scaffold from moving

A

Utility rope

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When communicating with workers stranded on scaffolding, ascertain what 3 things from them

A
  1. Workers physical/mental state 2. If they know the cause of the stall 3. If there are coworkers inside who can lend assistance
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

When should a HT be lowered to workers on a stalled scaffold

A

When they’re stranded on a windowless area of a building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are 3 causes of occupied stalled scaffold

A
  1. Overheated hoist motors 2. Loose electrical connections 3. Tripped breakers
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Besides removing victims from scaffold via rope or windows, what other method may be at our disposal

A

Aerial or TL if it is in reach of scaffold

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What must victims do first if they are being hauled in through an open window

A

Disconnect from their safety line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How long should you wait before pressing the reset button on an overheated hoist motor

A

15 minutes

Note: Then have worker push the reset on the hoist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

True or false. If an electric hoist scaffold can be lowered even when overheated, members should have the worker lower scaffold to next level or ground

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What operation is considered dangerous for a victim on a scaffold

A

Lifesaving rope evolution

18
Q

Members on the roof of an occupied hanging or off-level scaffold should relay what info to units operating below

A

Any potential collapse of parapet, exterior wall or rigging system

19
Q

During hanging or off-level scaffold, how will rescue be performed if a window cannot be opened

A

High angle rescue

Note: This involves a Squad/Rescue member going down on high angle rope to the victim

20
Q

At a high angle rope rescue, which direction with the victim and rescuer be taken. Hauled up or lowered down to safety

A

Either direction

Note: Will depend on the situation

21
Q

Who will perform glass cutting

A

Rescue or Squad

22
Q

During occupied stalled suspended scaffold emergencies, name an additional consideration units may do

A

Await the arrival of scaffold mechanic

23
Q

Name 8 considerations the IC should take when considering to cut glass windows

A
  1. Physical state of victim 2. Time 3. Condition of scaffold 4. Weather 5. Inability to access victim via rope 6. Distance from roof to scaffold 7. Availability of scaffold company mechanic 8. Availability of Glassier
24
Q

If ARC welding is being performed during a scaffold emergency, what shall units ensure has occurred (2 answers)

A

Welding has ceased and all power sources have been shut down

25
Q

Name 3 types of rigging devices used with suspended scaffolds

A
  1. Cornice roof hook 2. Parapet clamp 3. Rolling outrigger and weights