SOP 309 Rapid Intervention and Firefighter Safety Survival Flashcards
Who is normally assigned RIT?
The third due engine on the response order
RIT shall be a minimum number of how many personnel?
Three
RIT functions and responsibilities include what (SOP)?
- Assembly of RIT tools
- Conduct an independent size up and 360 of the scene
- Establish secondary means of egress
- Assist in incident activities that improve conditions for firefighter safety with the ability to abandon them in the event of a RIT activation
- Continuous size up and situational awareness of personnel on three corners of the structure and monitoring of radio traffic
Who should RIT be reassigned to if tactical considerations have been met?
Second due tower
Who is normally assigned as the RIT group supervisor?
Chief officer, SAM officer or SME on scene
In the event of a Mayday what is required of the IC?
- Assign a RIT group supervisor
- Acknowledge the Mayday, consider inside-out approach base on fire ground factors and Mayday information
- Request an additional alarm
- Deploy RIT team as needed based on fire ground factors, Mayday information and follow up information from the rescuers via inside-out apIn the proach.
- Consider moving incident communications to another radio channel
- Continual assessment of personnel assigned to tactical objectives committed to meeting the priorities of the IAP.
In the event that a Mayday is not rapidly and successfully brought to a conclusion what is the progression of deployed resources?
- Entry and search for a trapped or injured firefighter
- Assessment, stabilization and packaging of the affected firefighter
- Removal of firefighter from the Hazard zone
RIT functions and responsibilities include what (Reference Guide)?
- Assembly of RIT tools
- Conduct and independent size up and 360 of the scene
- Establish secondary means of egress
- Entry and search for a trapped or injured firefighter
- Assessment, stabilization and packaging of the affected firefighter
- Removal of firefighter from the Hazard zone
What tools are assembled by the RIT team?
- Fast bag
- Irons
- TIC
- Search rope bag
- RIT bag
What are the benchmarks reported to the RIT group supervisor during Entry and Search?
- RIT entry and location
- Location reports as RIT progresses through the structure
What are the benchmarks reported to the RIT group supervisor during Assessment, stabilization and packaging?
- Firefighter located
- Air supply secured
- Packaging complete
What are the benchmarks reported to the RIT group supervisor during Removal from the hazard zone?
- Removal in progress toward an identified egress point
- Firefighter and RIT are out of the building with a PAR