Set 6 Flashcards

1
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

What satisfies the maintenance rule program during different MODES of operation?

A
  • MODES 1 -4:*
  • *CRMP**
  • ≤ MODE 5:*
  • *Shutdown Risk Assessment**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • LOT 802.34 Testing Req. Following Testing*
    • *

What is the requirements to use reduced controls?

A

Repair / Replacement on Class 2 or 3 component
AND
GQA Safety Significance is ≤ Low Safety
AND
Pressure Boundary is ≤ Low Risk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

Who approves high risk plans?

A

Duty Plant Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

Who is authorized to be a work start authority?

A

Has / has held a SRO license at STP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

What are the RMTS quantitative risk management thresholds?

A
  • CDF < 10-6 / LERF < 10-7:*
  • *Normal Work Controls**

CDF ≥ 10-6 / LERF ≥ 10-7:
RMAT / RICT apply
Assess non-quantifiable factors
Implements RMAs

  • CDF ≥ 10-5 / LERF ≥ 10-6:*
  • *Follow Tech specs**

CDF ≥ 10-3 / LERF ≥ 10-4:
Voluntary entry into configuration prohibited
If in configuration due to emergency, implement RMAs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

When can risk management actions be applied?

A

All MODES

Directed by SM and approved by Plant General Manager.

RMAs provide:

  • Increased risk awareness and control
  • Reduce duration of maintenance activity
  • Minimize the magnitude of risk increase
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

What are schedule levels A/B/C/D?

A

Level A:
Highest Level of Control
Changes of more than 1 hr require WWM/SM Concurrence

  • Level B:*
  • *Changes of more than 1 day require WWM/SM Concurrence**
  • Level C:*
  • *Work included in schedule**
  • Most work*
  • Level D:*
  • *Misc work that may or may not be on schedule**
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

Can the CRMP be applied if all trains required by the LCO are inoperable?

A

Yes

≥ 1 train must be PRA Functional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

What classifies as emergency maintenance?

A

Prevent / mitigate an accident

Prevent unplanned release

Protect human life

Prevent significant plant damage

  • Authorized by SM
  • Does NOT need a work package
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

Who approves medium risk plans?

A

Duty Operations Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • LOT 802.34 Testing Req. Following Testing*
    • *

What is required if work authority decides to waive a PMT?

A

Document Steps Waived

The Reason

Alternate test method (If necessary)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

What is a work activity risk (WAR)?

A

Impact on operations during MODES 1 - 4

Primary focus is interruption of power generation

Includes impact of removing / returning equipment.

Work Control / Work week manager develops WAR.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

When can risk management tech specs (CRMP) be applied?

A

MODES 1 - 2

Applies to extended LCO times.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • LOT 802.33 Equipment Maintenance / Operations Interface*
    • *

What are the three things needed for a good post maintenance test?

A

Corrected original deficiency

Did not introduce new deficiency

Ensures return to service test will pass

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • LOT 802.34 Testing Req. Following Testing*
    • *

If a PMT is waived and the request for the waiver if for:

  • Safety-Related Equipment (Not Risk-Ranked)
  • GQA/PGR High/Medium Risk
  • Pressure Boundary Leakage
  • Seat Leakage for reactivity valves

Who’s permission is required for this waiver?

A

Engineering Duty Manager
OR
Engineering Duty Supervisor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  • LOT 802.34 Testing Req. Following Testing*
    • *

What are the equipment groupings per ASME Section XI?

A
  • Class 1:*
  • *RCS Pressure Boundary**
  • Class 2:*
  • *Essential Safety Systems**
  • Class 3:*
  • *Essential Support Systems**