Set 6 Flashcards
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
What satisfies the maintenance rule program during different MODES of operation?
- MODES 1 -4:*
- *CRMP**
- ≤ MODE 5:*
- *Shutdown Risk Assessment**
- LOT 802.34 Testing Req. Following Testing*
- *
What is the requirements to use reduced controls?
Repair / Replacement on Class 2 or 3 component
AND
GQA Safety Significance is ≤ Low Safety
AND
Pressure Boundary is ≤ Low Risk
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
Who approves high risk plans?
Duty Plant Manager
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
Who is authorized to be a work start authority?
Has / has held a SRO license at STP
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
What are the RMTS quantitative risk management thresholds?
- CDF < 10-6 / LERF < 10-7:*
- *Normal Work Controls**
CDF ≥ 10-6 / LERF ≥ 10-7:
RMAT / RICT apply
Assess non-quantifiable factors
Implements RMAs
- CDF ≥ 10-5 / LERF ≥ 10-6:*
- *Follow Tech specs**
CDF ≥ 10-3 / LERF ≥ 10-4:
Voluntary entry into configuration prohibited
If in configuration due to emergency, implement RMAs
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
When can risk management actions be applied?
All MODES
Directed by SM and approved by Plant General Manager.
RMAs provide:
- Increased risk awareness and control
- Reduce duration of maintenance activity
- Minimize the magnitude of risk increase
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
What are schedule levels A/B/C/D?
Level A:
Highest Level of Control
Changes of more than 1 hr require WWM/SM Concurrence
- Level B:*
- *Changes of more than 1 day require WWM/SM Concurrence**
- Level C:*
- *Work included in schedule**
- Most work*
- Level D:*
- *Misc work that may or may not be on schedule**
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
Can the CRMP be applied if all trains required by the LCO are inoperable?
Yes
≥ 1 train must be PRA Functional
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
What classifies as emergency maintenance?
Prevent / mitigate an accident
Prevent unplanned release
Protect human life
Prevent significant plant damage
- Authorized by SM
- Does NOT need a work package
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
Who approves medium risk plans?
Duty Operations Manager
- LOT 802.34 Testing Req. Following Testing*
- *
What is required if work authority decides to waive a PMT?
Document Steps Waived
The Reason
Alternate test method (If necessary)
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
What is a work activity risk (WAR)?
Impact on operations during MODES 1 - 4
Primary focus is interruption of power generation
Includes impact of removing / returning equipment.
Work Control / Work week manager develops WAR.
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
When can risk management tech specs (CRMP) be applied?
MODES 1 - 2
Applies to extended LCO times.
- LOT 802.33 Equipment Maintenance / Operations Interface*
- *
What are the three things needed for a good post maintenance test?
Corrected original deficiency
Did not introduce new deficiency
Ensures return to service test will pass
- LOT 802.34 Testing Req. Following Testing*
- *
If a PMT is waived and the request for the waiver if for:
- Safety-Related Equipment (Not Risk-Ranked)
- GQA/PGR High/Medium Risk
- Pressure Boundary Leakage
- Seat Leakage for reactivity valves
Who’s permission is required for this waiver?
Engineering Duty Manager
OR
Engineering Duty Supervisor