Set 3 Flashcards
- 0PSP03-XC-0002 Initial Containment Inspection*
- *
What is the purpose of 0PSP03-XC-0002 Initial Containment Inspection to Establish Integrity?
- *Visual Inspection to ensure no loose debris present**
- Could clog emergency sump strainers during LOCA*
Verify 48” containment purge valves closed
Verify 18” Supplementary purge valves open/closed
- 0PSP03-XC-0002 Initial Containment Inspection*
- *
Who can perform the initial containment inspection to establish integrity?
SRO
- 0PSP03-XC-0002 Initial Containment Inspection*
- *
What is the max occupancy of containment during normal operations?
- *72 people**
- PAL and AAL must be OPERABLE*
Normal Operations is MODE 1 - 4 (Doors normally closed) or MODE 5 with the doors closed
- 0PSP03-XC-0002A Containment Entry (Integrity Established)*
- *
Who can perform all sections of this surveillance with exception of closing out the surveillance?
Non-Licensed work control SRO
- 0PSP03-XC-0002A Containment Entry (Integrity Established)*
- *
Who determines what tools, test equipment, or other material may be left inside the RCB once personnel exit containment with integrity established?
SM / Unit Supervisor
- 0PSP03-XC-0002A Containment Entry (Integrity Established)*
- *
If a Øa occurs while personnel are in containment, where should personnel evacuate?
Aux Air Lock
If Aux Air Lock unavailable, must reset Øa and open the PAL OCIV. Personnel can then exit via the PAL.
- 0POP01-ZA-0001 Admin Guidelines*
- *
While checking the position of a normally locked closed valve, the valve operator cannot be moved due to the locking device. What is the proper method for checking the position of this valve?
Remove the locking device
Check valve in closed direction
- 0POP01-ZA-0001 Admin Guidelines*
- *
When is Independent Verification NOT required?
Changing position does not render component incapable of performing it’s safety function
- 0POP01-ZA-0001 Admin Guidelines*
- *
How is a locked throttle valve’s position verified?
Visual Observation
Local Indicators
SM’s permission required to move locked throttle valve.
- 0POP01-ZA-0001 Admin Guidelines*
- *
When are valves in the AFWST pit required to be checked?
If security barrier is breached
- 0POP01-ZA-0001 Admin Guidelines*
- *
Following an outage, whose permission is needed to waive the initial valve lineup for a system?
Unit’s Operation Manager
One of the following conditions must exist:
- System has remained in service
- No work performed on system and system not modified
- If work performed, then process was controlled by ECO process
Note:
Valves in MAB pit rooms not required to be checked for initial valve lineups
- 0POP01-ZQ-0022 Plant OPS Shift Routine*
- *
If multiple channels are not available for a channel check, what must be done?
Compare indicated value with data obtained from previous log
Channel check compares channel’s indication with other indications monitoring the same parameter.
- Has nothing to do with acceptance criteria.
- 0POP01-ZQ-0022 Plant OPS Shift Routine*
- *
Who reviews the safety function checklist?
Unit Supervisor
On-coming RO completes the safety function checklist
- 0POP01-ZQ-0022 Plant OPS Shift Routine*
- *
How far back in the logs should the on-coming watchstanders review?
Whichever is less:
Since last watch
OR
Prior 72 hrs
- 0POP01-ZQ-0022 Plant OPS Shift Routine*
- *
Who ensures appropriate entries are made in the control room logbook?
Unit Supervisor